Which failure arrives first — page 11
How much of the plate is bending
A tee stub is an object nobody builds, and the whole component method rests on replacing a real end plate with one. The length of the substitute is not a dimension of the plate — it is the length of the cheapest fold the plate can collapse along, and two families of fold compete for it on a criterion with no strength in it at all.
The modes that were left out
Nobody runs every mode a model has, and the rule for how many is a mass count — enough to account for ninety per cent of the structure. The rule is written in the one quantity that converges fastest. On a twenty-storey frame two modes give the base shear to within one per cent and the force in the top storey to within twenty.
The pattern that stopped describing the building
A pushover analysis pushes with a load pattern chosen to resemble the first mode, and by the time the structure has done anything worth analysing it no longer has that mode. Recomputing the pattern as the frame softens changes the base shear by nine per cent and the drift at the fourth floor by a factor of four.