A haunch moves the worst stress range to its toe. The stress range up the height of the first interior post of a Vierendeel girder of six 2 m panels, 1.5 m deep, every member of the same section (I = 117 × 10⁶ mm⁴, W = 780 × 10³ mm³), crossed by a 100 kN load, over one crossing: the plain post (dashed), and the post with 250 mm haunches 2.00 times as deep at both corners (solid); with the constant-amplitude limits 52.3 MPa for detail category 71 (dotted). Plain, the range is 78.3 MPa at the corner. Haunched, it is 43.3 at the corner and jumps to 61.2 at the toe, 250 mm along the post — the largest anywhere in it, 61.2. Structural form

The corner that counts its crossings

As a load crosses a Vierendeel girder, the moment at a post's corner changes sign when the load passes that post. A static check reads the peak, and the peak says the posts beside the supports work twice as hard as the middle one. Fatigue reads the range, and the range says every interior post works the same. A haunch at the corner lowers the corner's range and moves the worst of it to the haunch's toe — so a deeper haunch soon buys nothing, a longer one keeps paying, and a toe two detail categories worse than the corner cancels the haunch outright.

The same damper behind a lever is best at a larger motion. The damping of one storey with 2% of its own damping and a brace as stiff as the storey, with an α = 0.3 damper sized to its brace's best at the design amplitude with no amplifier, against the storey's amplitude, with the same damper behind stroke amplifiers of ratio 1, 2 and 3. A ratio f makes the damper act on the storey as one f to the power 1 + α larger — 2.46 and 4.17 times — so it locks more, and its band moves up by about f to the power (1 + α)/(1 − α): its best is near 3.8 and 7.5 times the design amplitude. At a hundredth of the design amplitude all three give 1.4%; at the design amplitude 22.7%, 6.4% and 2.3%. Dynamics

The lever that moves the damper and not the band

A damper whose force goes as a low power of its speed is sized for the earthquake and locks in the wind. A toggle or scissor linkage multiplies its stroke, and it seemed it might move the band of amplitudes the damper serves down towards the wind. It cannot. Behind a lever of ratio f the same damper acts on the storey as one f to the power 1 + α larger, so its band moves up, not down; re-sized to the design amplitude, it gives the storey exactly the curve it had without the lever, and what has changed is the damper — a quarter of the size, a third of the force, three times the stroke. What would widen the band is a ratio that grows with the motion, and a toggle has one — until its links lie straight and it locks.

The range belongs to the truss. The worst hanger force range against the tie's largest moment in a tied arch of 100 m span and 17 m rise on 32 crossed hangers of 3,000 mm² bar, 60 kN/m of dead load and 60 kN/m of live load run on from either end, as the hangers' stiffness runs from four times a plain bar's to a fiftieth of it (dots), and for the same arch on vertical hangers (the lone dot). Softening the crossed hangers walks the bridge from 678 kN of range and 316 kN·m of tie moment to 557 and 1,154; vertical hangers sit at 194 and 3,505. The line bends nowhere near the vertical arch's point: a soft network is still a truss. Structural form

The hanger that cannot be made soft enough

A network arch's crossed hangers swing through nearly all their force as traffic passes, because they are the web of a truss. Make them softer — a spring at each anchorage — and the tie ought to take back some of the shear and the hangers' ranges ought to fall. They hardly do. A tenth of the stiffness takes 6 per cent off the worst range and adds a third to the tie's bending; a fiftieth takes 18 per cent off and multiplies the tie's bending by 3.7. The range belongs to the truss and leaves only when the truss does, which vertical hangers show at 194 kN against 678 and eleven times the bending. So the hanger is sized for its range, eight times the area its strength needs, and the stiffness that comes with it costs the range nothing.

Shorter after every cycle, at the same load. The shortening of a column hinge at the end of each cycle, in yield strains, for an I-section of 3,000 mm² and 200 mm depth and the rectangle of the same area, each carrying a constant 30% of its squash load while its curvature cycles between ±3.0 times its first-yield curvature, in elastic–perfectly plastic steel. The I-section shortens by 8.14 yield strains every cycle, 97.1 after 12; the rectangle by 1.60, 19.4. Neither settles: the load has not changed, and the column is shorter after every cycle. Materials

The column that shortens on every cycle

A column hinge bent back and forth by an earthquake carries its share of the building's weight the whole time. In elastic–perfectly plastic steel an I-section at three tenths of its squash load, cycled to three times its first-yield curvature each way, comes back from every cycle shorter by eight yield strains, and goes on doing so: it never settles. The flange that yields in compression shortens, and the other flange, carrying its part of the column's load, never reaches yield in tension to pull it back. A rectangle of the same area shortens a fifth as fast, and the overturning that swings the column's load up and down hardly matters. The weight and the curvature make the ratchet between them.

A screen damps a tank on a tower and barely touches a standpipe. The rms drift under broadband ground shaking, as a share of the same structure with its water frozen to the wall, against the damping a screen gives the sloshing: a steel standpipe 10 m across and 30 m tall with a 12 mm shell, full (solid), and the water tower of the earlier essay, a 12 m tank 8 m deep on a tower of 2.5 s (dashed). Plain water, at half a per cent: 0.82 and 1.01. A screen giving 10%: 0.76 and 0.40. The standpipe's gain comes almost entirely from leaving the lens out of the shaft's motion, which plain water already does. Dynamics

The tank that is its own tower

A standpipe holds its water in its own shaft, so the water fills a height several times its width. Only a lens of it near the surface sloshes — 0.455ρπR³, 178 t of the 2,199 t in a steel standpipe 10 m across and 30 m tall — and that lens stops growing once the water is deeper than a radius, so its period is set by the width alone: 3.3 s, against the shaft's 0.38. The lens is 8% of the water but a quarter of the shaft's moving mass, because it sits where the shaft moves most. It is far too slow to be tuned as a damper, and a screen can do little with it; what it does instead is stay still while the shaft sways, which takes nearly a fifth off the drift a frozen-water calculation predicts.

The preload a storm can live with, raised by a spring under the nut. The largest preload the bolts of a 500 × 400 × 20 mm base plate with two M24 holding-down bolts in each of two rows can be given and come out of a storm without stretching, against the stiffness of a stack of disc springs under each nut, for storms to ±165, ±170, ±175 kN·m; dashed, the same for the bare base; dotted, the bolt's yield of 226 kN. To ±170 kN·m the bare base keeps at most 128 kN; with a stack of 500 kN/mm, 150; 100 kN/mm, 187; 20 kN/mm, 214; 5 kN/mm, 223. Connections

The spring under the nut

Retightening a column base after every storm makes its bolts ratchet, because a storm can only live with 128 kN of preload and the spanner keeps putting back 150. A stack of disc springs under each nut changes what the storm can live with. Soft enough, the bolts never reach their yield: the compression side keeps its preload, the bed's resultant moves out to the plate's edge, and the moment rides on lever arm rather than on bolt force. A stack as stiff as the bolt itself keeps 150 kN through every storm. Much softer, and the storm the bolts no longer feel lands on the grout.

The best compensation is less than the prediction. For every floor of a 40-storey building of 3.6 m storeys, its perimeter columns at 12 N/mm² and its core at 6 under the finished load, cast a floor every seven days, with 25 per cent of the load arriving as finishes 90 days after the frame is complete and creep coefficient 2.2, from its fit-out to thirty years, with the creep anywhere within ±30 per cent of the design value: the largest amount any floor stands high (dashed) and stands low (light), and the worse of the two (solid), against the share of its predicted thirty-year movement each floor is set high by. Uncompensated, a floor ends 31.9 mm low; compensated in full, a floor stands 16.0 mm high at its fit-out; the worst is smallest, 11.0 mm, at 0.79 of the prediction, where level 40 standing high 0 days after its fit-out under creep ×0.70 balances level 33 standing low after thirty years under creep ×1.30. Deflection

The floor that is level on one date

Each floor of a tall concrete building is set high by the amount its columns are predicted to drop against the core, so that it arrives level. Counted in time, the drop does not peak at mid-height and stop at the roof: the worst floor of a forty-storey building is level 31, the roof moves 24 mm, and half the movement is still to come when the floors are fitted out. Set high by all of the prediction, a floor is level on one date thirty years away and 16 mm high at handover. With the creep known to ±30 per cent, setting it high by about four fifths of the prediction makes the worst floor's error 11 mm instead of 16. And none of it changes what the partitions see.

In a core, the depth has to tune the tank, and only shallow water is slow. The sloshing period of rectangular tanks 6, 10, 15 m long against the depth of their water (logarithmic), with building periods of 4, 5, 6 and 8 s (dotted). Deep, each tank is as fast as it can be: 2.77 s, 3.58 s, 4.38 s. To be tuned to a 5 s building the 10 m tank needs 1.80 m of water; to 4 s, 3.50 m; to 8 s, 0.65 m. A building faster than 3.58 s cannot be reached by the 10 m tank at any depth. Dynamics

The tank that must be shallow to be slow

A deep tank's sloshing period is set by its width alone, so a tank in a tall building's core ought to be tuned by choosing how wide to make it. It cannot be. A deep tank fast enough to fit is too fast for the building: 3.6 s for a core 10 m across, where a 5 s building would need a tank 19.5 m long and an 8 s one 50 m. The depth has to tune it, and only shallow water is slow — 1.73 m for 5 s, 0.63 m for 8. Shallow water is the efficient kind, with four fifths of it sloshing. But at the accelerations the tank exists to reduce, the wave it makes is a quarter of its depth on a 5 s building and seven tenths on an 8 s one, and the linear tuning it was designed by has stopped describing it.

The order of building decides which supports keep the secondary moment. The secondary moment at each interior support of a five-span beam of 16 + 16 + 16 + 16 + 16 m prestressed with 2,400 kN on a parabolic tendon, built and stressed from one end, from both ends towards a closure bay, from the middle outwards, and all at once. From one end: 161, 175, 160, 219 kN·m; from both ends: 161, 172, 172, 161 kN·m; from the middle out: 215, 120, 120, 215 kN·m; all at once: 344, 258, 258, 344 kN·m. Internal forces

The beam built towards its own middle

A continuous prestressed beam built one bay at a time from one end keeps about half the secondary moment a beam stressed at once would carry, and most of it at the end where it was finished. Built from both ends towards a closure bay, it is symmetric, and the closure's supports keep only a little more than the rest: 172 kN·m against 161. Built from the middle outwards, the first interior supports — the ones the load hogs hardest — keep 215, 63 per cent of the at-once value, for any length of beam. The order of construction is a design variable. Creep then takes back most of the choice.

Past yield, the notch trades stress for strain. The root of a notch of elastic factor 3.0 in a mild steel whose cyclic curve reaches 0.2 per cent strain at 252 N/mm², under a nominal stress of 200 N/mm²: the cyclic stress–strain curve (solid), the elastic line the root would follow if it stayed elastic (thin), and Neuber's hyperbola σε = (KₜS)²/E (dashed), which the curve crosses at the root's state. Elastic, the root would carry 600 N/mm² at 0.30 per cent. By Neuber it carries 293 at 0.61 per cent; by Glinka's energy rule 272 at 0.44; by the linear strain rule 246 at 0.30. Materials

The notch that trades stress for strain

A notch with an elastic factor of three triples the stress at its root only while the root stays elastic, which in a mild steel is up to a nominal stress of about 84 N/mm². Past that the root's stress and strain part company: at a nominal 200 the root carries 293 N/mm², not 600, and strains 0.61 per cent, twice what the elastic factor implies. Neuber's rule and Glinka's bracket the truth a factor apart, and in the low-cycle range that factor is a factor of two in life. The trade has two gifts in it: one overload leaves the root in compression, and a mean stress mostly yields itself away.

On the road the beam's top fibre has nothing left. The top fibre along the 12 m pretensioned beam, 300 × 700 mm, with eight strands, its schedule drawn for the bed and for yard bearers 1.0 m in from each end, the worst of the two bounces at each section: on its yard bearers standing still and bouncing ±30 per cent, and on a trailer carrying it 1.5 m from its front end and 2.5 m from its rear standing still and bouncing; dotted, the yard's limit of −3.0 N/mm². Yard bearers, still, −2.98 at 2.0 m; yard bearers, ±30 per cent, −3.26 at 9.8 m; trailer, still, −4.68 at 9.5 m; trailer, ±30 per cent, −4.88 at 9.5 m. Sections and stress

The beam the haulier holds

A pretensioned beam leaves the yard on a trailer, carried on a turntable and a bogie the haulier places, and bounced on them at road speed. The bounce works both ways: a wheel rising adds to the beam's weight over its overhangs, and a wheel falling away takes weight off — and with it the sag that was relieving the beam's top fibre between its supports. On the yard's own bearers a bounce of 30 per cent takes as much from that fibre as a stack placed 100 mm out of line. A rear overhang of 2.5 m takes five times as much. With the yard's schedule, a trailer may hold this beam only within half a metre and three quarters of a metre of its ends.

Each new set of shims gives back the creep since the last. The creep force in one arm of a 200 m concrete building built a storey every week and fitted out over six months, with an outrigger at 149 m of 1.0 × 10⁸ kN·m a radian connected on day 385, over fifty years on a logarithmic axis: connected and left (dashed), adjusted once at 1 years, and adjusted at 1, 3 and 10 years, the arm's force falling to nothing at each adjustment; the design wind's 5.80 MN dotted. Left alone the arm ends at 3.48 MN. Adjusted once it ends at 2.58; adjusted at 1, 3 and 10 years it never holds more than 1.40 and ends at 0.91. Structural form

The arm that is reset by hand

An outrigger connected to a concrete building at topping out collects the core's and the columns' differential creep for fifty years, 3.48 MN in each arm against a design wind of 5.80. A damper lets the creep through and stops the wind, but it is a machine. The older answer is a joint closed with shims and opened every few years to take the creep out. Three visits, at one, three and ten years, hold the arm below 1.40 MN, and spaced like the creep they do it with roughly equal thicknesses of shim each time. Evenly spaced, the same three visits hold 2.48. And a visit that is missed costs exactly the creep it was there to remove.

The forging is a pad nobody designed. For a 2.0 t tup at 7.0 m/s, 49 kJ, on the 150 t foundation with its 30 t anvil on a pad: the largest force through the anvil's pad (solid) against the forging's flow force (logarithmic), with the dies meeting at the right; dashed, the pad force if the same impulse arrived all at once, as a fixed-impulse calculation takes it. Through a forging flowing at 0.1 MN the pad carries 0.15 MN, against 3.70 for the same impulse delivered at once; at 1.5 MN, 2.32 against 3.93; with the dies meeting, 5.86 against 5.93. Dynamics

The forging that cushions the blow

A forge hammer's foundation is usually designed for a blow treated as a fixed impulse: the tup's momentum, multiplied by a factor for its rebound. The blow is not fixed. Between the tup and the anvil lies a hot forging, a plastic body that flows under the tup, stretches the blow to 48 milliseconds and absorbs nearly all of its 49 kJ, so that the anvil's pad feels 0.46 MN. As the part cools it flows less, the blow shortens, the tup rebounds, and the pad force climbs to 5.86 MN when the dies meet with nothing between them. The foundation is designed by the blow that does no work.

A joint poured twice ends near where the slab's day puts it. For two 12 m pretensioned beams, 300 mm wide and 700 mm deep, with a 160 mm in-situ slab 1.2 m wide, in 60 per cent humidity, made continuous over their pier: the moment in the joint, sagging positive, over thirty years, with its first stage — the diaphragm and the beams' bottom connection — cast at 28 days and the slab at 42, 90 and 365 (solid), against the joint cast once, with each slab (dashed). With the slab at 42 days it ends at 139 kN·m against 160 poured once; with the slab at 90 days it ends at 41 kN·m against 40 poured once; with the slab at 365 days it ends at −165 kN·m against −214 poured once. The first stage starts each history early and the slab's weight kicks it into hog on the day it is cast; after that each solid line runs beside its dashed one. Deflection

The joint poured twice over the pier

A continuity joint over a pier can be cast in two stages — the diaphragm and the beams' bottom connection first, the slab weeks later — in the hope that the early pour catches the beams' creep and the late one leaves the slab's shrinkage little to do. It does neither. From the slab's day on the composite section holds exactly what a single pour on that day would have held, and the first stage adds only its own small account, of either sign. It trims a year-old slab's hog by a fifth, and it asks a joint with half the cracking moment to carry the beams through the months between.

A prevailing wind leans the footing, and the lean stops. The 8 m strip of EI 540 MN·m² on a bed of 50 MN/m² under a 1,000 kN column on ground that unloads and reloads 4 times as stiffly as it first loads, rocked by storms that push to 1,000 kN·m one way and swing back all, three quarters, half, a quarter or none of that the other: the column's tilt at rest after each of eight storms, in milliradians, positive the way the storms push. After eight: 0.011, 0.064, 0.117, 0.171, 0.218. Each settles within three storms; the lean is set by how unequal the storms are, not by how many there have been. Internal forces

The footing a prevailing wind leans

A footing rocked by storms that reverse evenly settles into a symmetric bowl and stops. A footing under a frame in a prevailing wind is pushed harder one way than the other, and its ground keeps the difference. It leans — and then it stops leaning, within three storms, at a tilt set by how unequal the storms are and how large the largest has been. Fifty years of storms lean it further only in the years when a storm beats every one before it, and between those years nothing that happens to the footing moves it at all.

Lightened where it reverses, and the range follows. The stress range each post's corner sweeps over one crossing of a Vierendeel girder of six 2 m panels, 1.5 m deep, its chords all of one section (I = 117 × 10⁶ mm⁴, W = 780 × 10³ mm³), crossed by a 100 kN load: uniform posts, posts sized to their peaks, and posts sized to both their peaks and their ranges. Uniform, every interior corner ranges 76.1 to 78.3 MPa. Sized to peaks, the middle post's range is 150.8 MPa and its neighbours' 101.6, against the uniform girder's worst of 78.3. Sized to both, no corner exceeds 78.3 MPa. Structural form

The post sized by what it must survive

A Vierendeel girder's posts are usually all one section, and a crossing load gives them peaks that differ by a factor of two and ranges that barely differ at all. Size each post to its peak and the steel falls by a quarter — and the middle post, lightened to two-fifths of the chords, sweeps twice the stress range the whole girder used to, and lasts a seventh as long. Size each post to its range instead and the girder needs less steel than the uniform one, not more, because the posts that can be lightened are the ones at the ends.

Where each filler's depth goes. The crushable depth left in each filler between buildings of 500 t and 300 t, periods 0.8 and 1.2 s, 50 mm apart, through a record of six one-second sine cycles peaking at 0.35 g, for 40 mm fillers crushable over 24 mm, each just strong enough to stop a 2.85 m/s collision from new. Uniform: 5 mm when its hardest contact arrives at 2.76 m/s, 0 mm at the end. Graded: 12 mm when its hardest contact arrives at 2.76 m/s, 6 mm at the end. 50% on speed: 0 mm when its hardest contact arrives at 2.88 m/s, 0 mm at the end. The graded filler's soft layer goes in the first middling contacts and its strong layer is barely reached; the other two lose depth to every middling contact and have little or none left when the largest arrives. Dynamics

The filler that is used up before the worst

A crushable filler between two buildings is sized for the hardest collision it might meet, meeting it new. An earthquake does not oblige: the hardest contact arrives after a dozen middling ones, and each has taken some of the depth. Through a record of six cycles, a filler half of whose strength follows its crushing speed is dense before the worst contact arrives, and a uniform one has five millimetres left. A graded filler still has twelve. Yet the graded filler meets the worst contact at 56 MN and the spent rate-sensitive one at 39. Keeping depth is not the same as being gentle, and the order of the contacts barely matters.

Pressed and pulled, the footing leans once and stops. The column's tilt at rest after each of eight storms reversing fully to 300 kN·m each way, on the 8 m strip of EI 540 MN·m², weighing 320 kN, on a bed of 50 MN/m² under a column carrying 1,000 kN, on ground that unloads and reloads 4 times as stiffly as it first loads, for loads swinging by 0, 50, 100, 150, 200 per cent. 0 per cent: −0.007 milliradians after the first storm and 0.003 after the eighth; 50 per cent: 0.112 milliradians after the first storm and 0.103 after the eighth; 100 per cent: 0.109 milliradians after the first storm and 0.091 after the eighth; 150 per cent: 0.113 milliradians after the first storm and 0.095 after the eighth; 200 per cent: 0.114 milliradians after the first storm and 0.102 after the eighth. The lean is towards the end the heavier half of each storm presses; it stops within three storms whether or not the strip ever hangs clear. Internal forces

The footing that hangs from its column

A footing under a bracing bay's column is pressed hard when the wind pushes one way and pulled when it swings back, and if the pull is larger than the footing's weight it hangs from the column, clear of the ground, for part of every storm. It looks like a footing free to come down somewhere new each time, and walk. It does not walk. The ground under it keeps the memory of every press, and a footing that is not touching the ground cannot change that memory; it comes back down into its own bowl, leans once towards its harder press, and stops within three storms.

Where the knees begin to alternate. The shakedown factor (solid) and collapse factor (thin) of a portal 10 m wide and 5 m high, plastic moment 200 kNm in the columns and 200 in the beam, on pinned bases, with 160 kN of gravity that comes and goes and a 1,000 kN roof carried at its knees, against the peak of a wind that reverses, first-order (dashed) and amplified. First-order, the shakedown and collapse factors are one line until the knees alternate, from a wind of 110 kN; amplified, from 90 kN. At 60 kN: shakedown 0.727 first-order and 0.692 amplified, collapse 0.727 and 0.692. At 120 kN: shakedown 0.533 first-order and 0.488 amplified, collapse 0.571 and 0.539. At 200 kN: shakedown 0.348 first-order and 0.326 amplified, collapse 0.400 and 0.366. Materials

The roof that makes the wind worse every storm

A portal frame's shakedown check is made on its elastic moments, and the elastic moments a heavy roof sways are larger than first-order analysis says: each storm's wind is amplified by 1/(1 − N/Ncr), on its way out and on its way back. On pinned bases under a 1,000 kN roof that takes the wind at which the knees start to alternate from 110 kN down to 90, and the shakedown load down by 4.8 per cent where gravity leads and 8.4 where the wind does. Fixed bases are worth more under a heavy roof than without one, but by half again, not twice.

A scatter of a few per cent in the headways and the rhythm is gone. The damping a 120 m stay at 3,500 kN, 1.01 Hz, over a deck mode at 2.01 Hz damped at 1.0 per cent needs to hold a typical history still, under identical vehicles, each giving the deck the impulse with which a random stream of them every 2.0 s on average gives it an rms of 7.1 mm, arriving every 1.987 s on average — 4 deck periods — against the scatter of their headways (coefficient of variation, logarithmic), from integrating the deck and the stay together over four 1,500 s histories at each point. Exactly regular, 0.99 per cent; scattered by 1 per cent, 0.86 per cent; by 2 per cent, 0.58 per cent; by 5 per cent, 0.13 per cent; at random, 0.05 per cent. The requirement halves at a scatter of 2.2 per cent. Dynamics

The convoy that keeps the deck's time

A deck shaken by traffic is shaken by vehicles, and vehicles arrive with a rhythm of their own. The same lorries that, arriving at random, move a stay's deck by 7 mm rms and ask the stay for six hundredths of a per cent of damping, move it by 20 mm and ask for a whole per cent if they arrive every four deck periods exactly. But the rhythm is fragile in a precise way: scatter the headways by two per cent and half the danger has gone, and the timing that has to be kept is a tenth of the deck's period whatever the headway and however damped the deck. Ordinary traffic is counted by a stay, not timed; a convoy driven by a machine might not be.

Under a light building the first thing the pump was holding up is the building. The hours after the pump stops at which each check on the basement is used up — the slab's 0.2 mm cracks and the building's flotation — against the number of storeys over it, with the water table risen 3.0 m and ground recovering in 12 hours; drawn at 48 hours where a check is never used up. The cracks' deadline is 9.5 h whatever the building. Flotation's is at once under 2 storeys, 1.0 h under 4 storeys, 4.7 h under 5 storeys, 10.1 h under 6 storeys, never under 8 storeys; with 5 storeys or fewer it comes first. Equilibrium

The building held down by its pump

A basement whose water table has risen above its design level is often given back its design head by a pump under the slab, and from then on it is safe while the pump runs. When the pump stops the water comes back on the ground's own clock, and the checks the pump was protecting are lost in an order the building's weight decides. Under eight storeys only the slab's cracks were ever at risk; under five, the building's flotation check goes first, four and three-quarter hours after the pump stops, and the slab's strength is never in question at all. A structure that was safe by its weight has become one that is safe by a machine, and the machine's reliability is now one of its loads.

The more it carries, the less it pulls when the fire is out. For a 9 m 457 × 191 × 67 steel beam held at its ends at 10 per cent of its own axial stiffness through the fire: the tension pulling on its ends once it has cooled (solid) and the largest tension while it is still hot (dashed), against the load it carries as a share of its cold plastic moment; dotted, the straight beam's 1,669 kN. At 0.10, 1,017 kN cold and 41 hot; at 0.39, 613 and 293; at 0.54, 477 and 397. From 0.56 the beam can find no sag that carries its load near the fire's peak and runs away. Materials

The beam that pays the fire back in sag

A steel beam held at its ends and kept straight through a fire yields short on the way up and pulls on its connections with its plastic shortening on the way down. A beam carrying a floor does not stay straight. Squeezed by its own expansion, it forms a hinge at about 500 °C and bows out of the way, hangs as a catenary while still hot, and keeps a metre of sag when it cools — length it no longer has to be pulled for. It ends the fire pulling a third as hard as the straight beam, nearly whatever holds it, and the hard pull comes earlier instead: at 800 °C, on connections that are as hot as it is.

The diagonals over the support are the girder's shortest-lived members. The years a diagonal's connection of the top bracing of a 1.5 m deep composite tub girder under a 250 mm deck, continuous over two 40 m spans, 480 kN lorries passing 2.5 m off its centre line lasts at two million such lorries a year, along a span, for fatigue categories 50, 71 and 90, logarithmic and drawn at 1,000 years where the range is below the category's cut-off and the life is without limit; dotted, 100 years. Where the deck is whole every category lasts without limit. At the worst diagonal, 34.5 m along, category 50 lasts 2 years, category 71 lasts 8 years, category 90 lasts 25 years. Sections and stress

The bracing nobody took out

The light truss that closes a steel tub girder while its deck is poured is usually left in once the deck has hardened, because taking it out from under a finished slab is more trouble than it is worth. Over most of a span that is harmless: the deck lifts the neutral axis to the top flanges and takes ninety-nine per cent of the shear round the top, and a passing lorry puts five newtons per square millimetre in a diagonal. Over an interior support, where the deck is cracked to its bars, the same diagonals sit six hundred millimetres from the axis and are handed a share of the torque, and each heavy lorry puts forty in them — the shortest-lived connections in the girder, on members nobody designed for anything after the day the concrete went off.

The more of the load that comes back, the less of it the row can carry for ever. The largest load 20 screws leaning at 45° in a row 56 mm apart carries for ever, as a share of its forward peak, against the share of it that comes back the other way each cycle (0 the same load repeated, 1 fully reversed), for each screw carrying none, half and all of its thread's first loss into the other way. Carrying 0 per cent: 0.96 repeated, 0.96 half reversed, 0.82 fully reversed; carrying 50 per cent: 0.96 repeated, 0.94 half reversed, 0.79 fully reversed; carrying 100 per cent: 0.96 repeated, 0.92 half reversed, 0.76 fully reversed. Connections

The row that is pushed as often as it is pulled

A row of leaning screws in a shear wall is loaded one way by the wind and then the other, and a screw that leans is pulled along its axis one way and pushed the other. Pulled, its axial force clamps the joint and friction helps it; pushed, it prises the joint open and the friction goes. So the row has a weaker side, and under a reversing load it settles exactly as it settles under a repeated one — the reversal does not start the ratchet again — but at a ceiling the pushed side sets, 0.79 of the pulled peak against 0.97. And it settles with a gap in the middle that every reversal crosses carrying nothing.