Theme

The load that will not hold still — page 5

Essays 97 to 120 of 165 on this thread, in the same order.
Every law with the spring cancelled, stroke against peak. Each point is one law for a structure of one mode with 1.0 per cent damping and a tuned mass of 2.0 per cent of its mass, tuned and damped by Den Hartog's rules with the mass's spring cancelled, its structure-velocity and relative-velocity gains on a grid: its peak response against the mass's peak stroke, both as multiples of the static deflection. Filled, the 731 laws that need no more than 0.50 of the applied force; faint, the 730 that need more. The passive mass is the ring, at 45.3 and 8.72. The lower edge of the filled cloud is the best a law of this kind can do for each stroke; at the passive stroke it is 7.38, and it falls steeply as the mass is given more room. Dynamics

The law that throws the tuning away

An actuator that pushes against a tuned mass and listens only to the structure pumps the mass's own mode. A law that also listens to the mass can be made safe in one move — cancel the mass's spring, so that it has no mode to pump — and every such law is stable. But cancelling the spring throws away the tuning that made the mass useful, and the actuator has to earn it back: below a third of the force on the structure, the law is worse than the passive mass it replaced. What it buys above that, it buys mostly by letting the mass travel further.

A sine's requirement grows with the deck, and a random deck's with its square. The damping a 120 m stay at 3,500 kN, 1.01 Hz needs to hold still, against the rms of the deck's movement at the anchorage, with the deck tuned to twice the stay. A sine of that rms: √2·σ·(dε/dx)/4, a straight line. Against it, a random deck with 1.0% damping of its own: the swing's variance over sixteen times the deck's damping ratio, a parabola for a typical history and, dotted, twice that for the mean square, with dots from integrating the stay and the deck together over five 2,000-second histories each. With the stay's own 0.10% the sine grows above an rms of 2 mm and the random deck above 9.1 mm — 6.4 mm for its mean square. At 7.5 mm the integration asks for 0.06% against an average of 0.07%, at 15 mm the integration asks for 0.25% against an average of 0.27%, at 23 mm the integration asks for 0.49% against an average of 0.61%, past the range the average claims and at 30 mm the integration asks for 0.71% against an average of 1.1%, past the range the average claims. Dynamics

The deck that forgets its own rhythm

A deck at twice a stay's frequency grows the stay whenever a quarter of the tension swing beats the damping. But a deck pushed by gusts is not a sine: its amplitude comes and goes and its phase drifts, and it holds a rhythm for seconds where the stay needs minutes to answer one. Against that deck the requirement is not a quarter of the swing but its square over sixteen times the deck's own damping — a sixth of the sine's at service, and a number set by how much the deck remembers rather than by how far it moves.

How long the pumps must run is set by how fast the water comes back. The floors that must be cast before the pumps stop under a 20 × 30 m basement dug 6 m below a water table at the surface, its 0.9 m slab and walls weighing 18.7 MN against 35.3 MN of uplift when the water is back, so that the weight stays ahead of the water at every instant, against the water's recovery time on a logarithmic scale, for a floor every 5, 7 and 10 days. If the water returns at once, five floors — the building has to be nearly heavy enough on its own. With a floor every 5 days: 3 at a 3-day recovery, 2 at 7, 0 at 14; a floor every 7 days: 4 at a 3-day recovery, 3 at 7, 1 at 14; a floor every 10 days: 4 at a 3-day recovery, 3 at 7, 2 at 14. Dashed, the closed form for weight added continuously at a floor a week, which runs about one floor below the steps: a floor arrives at the end of its cycle, not through it. Equilibrium

The water that comes back while the floors go up

A basement below the water table is built dry, inside an excavation kept pumped, and the building that will one day hold it down is not there yet. When the pumps stop, the water comes back over days and the frame goes up a floor a week, and the basement is safe only if the weight stays ahead of the water at every instant. How long the pumps must run is not set by how heavy the building is. It is set by one ratio — how much weight the frame adds while the ground refills — and for a basement that needs five floors on it to hold itself down, a seven-day recovery asks for three and a fourteen-day one for one.

Keep most of the spring and no law beats the mass that has no law. The least peak response of a structure of one mode with 1 per cent damping and a tuned mass of 2 per cent of its mass, an actuator between them held to 0.50 of the applied force and its stroke to 1.50 times the passive mass's, against the share of the tuning spring the law leaves in place (κ): 0.00: 4.65, 0.10: 4.81, 0.20: 5.14, 0.30: 5.02, 0.40: 5.55, 0.50: 5.67, 0.60: 6.41, 0.70: 7.77, 0.80: 7.58, 0.85: 9.88, 0.90: 12.24, 0.95: 10.25, 1.00: 8.81. The passive mass alone peaks at 8.72 (dashed). Cancelling the whole spring buys the most; every share kept costs some of it, and from about 0.85 upward no stable law under these limits does as well as no law at all — with the whole spring kept the best is the passive mass with a touch of extra damping, 8.81. Dynamics

Half a spring is neither tuning nor freedom

An actuator pushing on a tuned mass is safe if its law cancels the mass's spring, and it then needs half the applied force to do much better than the passive mass. The obvious compromise is to cancel only part of the spring, keeping some of the tuning in case the law is not enough. Search every law in the family and the compromise turns out to be the worst choice available: each share of spring kept costs performance and makes more of the laws unstable, and from about 85 per cent kept upward no stable law under the same limits does as well as the mass with no law at all.

A filler that knows the speed meets the collision hardest at its start. The contact force against the depth crushed in the hardest collision, 500 t and 300 t closing at 2.85 m/s with 761 kJ, on a 40 mm filler between 500 t and 300 t, crushable over 24 mm: uniform (dashed), with 50 per cent of its strength at that speed depending on the speed, and with all of it. Each is as strong as it must be to stop the collision in 24 mm. Uniform: 30.5 MN at first contact; 50 per cent on speed: 38.4 MN at first contact; all on speed: 63.4 MN at first contact. The crushing speed is highest at the first instant and falls to nothing, so a filler whose strength follows it spends its force at the start; the same area under a falling line needs a higher peak than under a level one, and a purely viscous filler's is twice the uniform's. Dynamics

The filler that knows how fast it is hit

A filler graded through its depth meets the small collisions softly and the hard one with a strong layer that has to be very strong, because every kilojoule the soft layer misses must be absorbed in less depth. A filler whose strength rises with the speed it is crushed at ranks collisions by speed instead, with no layers at all, and treats the middling collisions better than grading does. But it meets every collision hardest at its first instant, when the crushing speed is greatest, and a force that falls as the collision proceeds needs a higher peak to absorb the same energy in the same depth. A purely viscous filler that stops the hardest collision in 24 mm hits it with exactly twice the force of a uniform one.

A hanger that would push is a hanger that is not there. The force in each hanger of a tied arch of 100 m span and 17 m rise on 32 crossed hangers, carrying 60 kN/m of dead load over the span and 120 kN/m of live load over its left half, against the hanger's position along the tie. Solved as though every hanger could push (pale bars), 4 come out in compression, the worst at 185 kN. Solved with those hangers taken out until no remaining one is compressed (dark bars), 8 are slack — more than the linear solution has in compression, because each hanger that goes passes its share to its neighbours and some of them follow. Structural form

The deck that keeps the hangers in the truss

Crossing the hangers of a tied arch turns it from a frame that bends into a truss that does not, as long as every hanger is pulling. A hanger cannot push, and under a load on half the span some of them would have to. Solved as it really is — with those hangers taken out, and the ones that follow them — the arch keeps the linear answer exactly until the live load on half its span is about equal to its own dead weight, and past that the tie's moment doubles and then quadruples. The arch's own weight is the pretension nobody had to apply, and a heavier deck is a stiffer network.

The base comes back to a different joint. Moment against rotation at the base of a 500 × 400 × 20 mm base plate with two M24 holding-down bolts in each of two rows, preloaded to 150 kN a bolt, through four cycles to ±170 kN·m. It is stiff until the bed lets go at 57 kN·m, softer past it, and near 170 kN·m the bolts on the tension side yield and stretch for good. Coming back through zero the base is not the base it was: its bolts have kept 83 per cent of their preload, and it lets go at 46.0 kN·m instead of 56.6. After the first full cycle the loops lie on top of one another. Connections

The base that lets go and closes again

A column base whose holding-down bolts are preloaded is rigid until the moment on it lifts the plate off its bed, and then softer. Under a storm the moment goes one way and then the other, many times, and the question is whether the preload survives. It does, entirely, as long as no bolt yields — and on an ordinary base the bolts do not yield until the moment is three times what first lifts the plate. Past that the yielded bolts lose part of their preload once, and the loss stops within a cycle or two: the base settles rather than ratchets. What decides how much is lost is how close to its yield the bolt was tightened, so that past a point a larger preload leaves less after the storm.

On a flexible tower the full tank is not the worst one. The tower's base shear against how full the tank is, for a 12 m tank holding up to 8 m of water on a 25 m tower: a stiff tower (period 1.20 s with the tank full) and a flexible one (2.50 s), the liquid and tower coupled (solid) and with all the water bolted to the container (dashed). The stiff tower's shear rises all the way to full, 2,141 kN, against 2,728 kN rigid. The flexible tower's peaks at 84% full, 688 kN, and falls to 665 kN full; rigid water says 884 kN, flat from 37% full, because past the spectrum's last corner a heavier mass on the same spring draws the same force. Dynamics

The tank that sloshes the tower

On the ground a tank's liquid splits into a part that moves with the wall and a part that sloshes at its own long period, and the two answers can be added afterwards because they are orders apart. Lift the tank onto a tower and the tower's period moves up towards the sloshing period, the two masses stop being separate, and the system has two modes that belong to neither. Adding the ground answers then overstates the base shear by a third, treating the water as solid by as much again, the wave grows by half, and a flexible tower is worst with the tank about five-sixths full.

A crossed hanger swings through nearly all of its force. The largest and smallest force in each crossed hanger of a tied arch of 100 m span and 17 m rise on 32 hangers, with 60 kN/m of dead load and a live load of 60 kN/m running on from either end, each bar running from the one to the other. The worst range is 678 kN, from 49 to 727, in hanger 11; the largest force anywhere is 756 kN. 6 of the 32 go slack at some stage, and the worst range is 90% of the largest force anywhere: the live load's shear passes through the crossed hangers as through a truss's web, and swings them from nearly nothing to nearly their most. Structural form

The hangers that carry the shear twice

Crossing a tied arch's hangers turns them into the web of a truss, which is why the tie stops bending. It also means a live load's shear passes through them, so as a load runs on from either end each crossed hanger swings from nearly nothing to nearly its most: on a 100 m arch the worst swings through 678 kN, 90% of the largest force in any hanger, where a vertical hanger swings through 194, half of its own. More dead load raises the force and leaves the range alone. The arrangement that is best for strength is the one that hands its hangers to fatigue.

A damper too large stops damping. The damping of a structure with 2.0% of its own, against the size of a viscous damper held by a brace — the damper's force over the brace's at the structure's own frequency, on a logarithmic scale — for braces a quarter as stiff as the structure, as stiff, and four times as stiff. With the brace at 0.25 the damping peaks at 7.9% for a damper of 0.86; with the brace at 1.00 the damping peaks at 22.7% for a damper of 0.58; with the brace at 4.00 the damping peaks at 63.9% for a damper of 0.29. Either side of the peak it falls: a small damper barely moves, and a large one barely strokes — it locks, and the brace carries the motion as a spring. Dynamics

The damper is only as good as its brace

A viscous damper added to a frame is held by a brace, and the brace is a spring in series with it. That pair has a ceiling: the most damping it can add is (√(1+κ) − 1)/2, κ being the brace's stiffness over the frame's, reached at one damper size and lost on either side of it. A brace as stiff as the frame allows 20.7%; a quarter as stiff, 5.9%. A damper larger than the best one is not better — it strokes less, locks, and turns the brace into a strut that moves the resonance instead of flattening it.

The loads a portal can carry for ever. For a fixed-base portal 10 m wide and 5 m high, plastic moment 200 kNm in the columns and 200 in the beam, in the plane of the gravity load's peak V·L/Mp — the load comes and goes — and the wind's H·h/Mp — it reverses: the first-yield boundary (dotted), the shakedown boundary (solid), and the collapse boundary under the same two loads applied once (dashed). With little wind the shakedown boundary is the beam's own mechanism, which the wind does no work in, falling from 8 to 6.0 as the wind grows to H·h/Mp = 2.7; beyond that it is alternating plasticity at a column base, nearly level. The dot is 160 kN of gravity with 60 kN of wind and the ring its shakedown point, a factor of 0.88: the gravity load alone is at the beam's collapse load, and the wind takes 12% off what the pair can carry without doing any work in the beam's mechanism. Materials

The beam the wind walks without pushing

A fixed-base portal whose beam carries exactly its collapse load is safe under that load applied once. Add a wind that comes from either side — a wind that does no work at all in the beam's collapse mechanism — and the beam can no longer carry the load for ever: 12 per cent comes off, and above that the midspan gains fifteen milliradians every cycle while the frame does not sway. Each knee takes its worst moment from a different wind, and the beam assembles a mechanism no single storm drives.

The gaps that open after the arch is closed. For the 60 m fixed concrete rib rising 6 m under 60 kN/m, closed at 28 days with its abutments jacked apart to take up the day's gap: the gap between the rib and its springings that each movement opens after closure, in millimetres, against the years since, on a log scale — the rib's creep under its thrust, its shrinkage, and the ground consolidating under the thrust by 1.0 times its 8 mm immediate spread with 90% done at 10 years. After a hundred years they are 24.8, 16.2 and 8.0 mm, 48.9 in all, against the 13.6 mm the thrust shortened the rib on the day. The rib resists them while it creeps itself, so the gap it acts as if fixed against is 20.9 mm (fine dashes). Deflection

The jacks the arch forgets

Jack a fixed concrete arch's abutments apart before the crown is closed, by exactly the gap its thrust and its footings open on the day, and the springings start with no moment at all. A century later they carry 173 kN·m — half as much again as the 112 the jacks were set to remove. The thrust's own moment never relaxes; the jacks' correction does, as the rib creeps; and shrinkage and the ground's consolidation arrive after the jacks have gone. No single setting cancels movements that run on different clocks.

The water splits the tower's resonance, and a baffle flattens it. For a 12 m tank 8 m deep on a tower of period 2.5 s with 2% damping, 150 t of container, full: the base shear per unit of harmonic ground acceleration against the shaking's angular frequency, as a share of the frozen-water tower's peak. Frozen to its container, the water makes one resonance; free, it is a second mass on a spring tuned 0.69 times the tower's frequency, against Den Hartog's optimum of 0.71, and it splits the resonance in two — with half a per cent of damping both peaks are higher than the frozen one, 1.83 times it. A baffle giving 10% brings the peak to 0.21; the best damping for the rms, 27%, to 0.11. Dynamics

The water tower that could damp itself

A full water tower's sloshing water is a second mass on a spring, hung from the container at very nearly the tuning a designed tuned-mass damper would be given, and it weighs two-fifths as much as what it hangs from. Plain water has half a per cent of damping, so it splits the tower's resonance into two sharp peaks and helps nothing. A screen across the tank that gives it a tenth makes the water a damper: the tower's rms base shear falls to four-tenths of what it would be with the water frozen, and the same screen keeps working as the town empties the tank.

The columns and the core shorten apart for decades. For a 200 m concrete building built a storey every week, its perimeter columns at 12 N/mm² and its core at 6 at the base, with an outrigger at 149 m of 1.0 × 10⁸ kN·m a radian: how much the columns (solid) and the core (dashed) have shortened below the outrigger's level, and the difference between them (heavy), in mm, against the years since the first storey was cast, on a log scale. When the building tops out, in week 55, the difference is 7.0 mm; after fifty years it is 30.5. 77% of the difference arrives after the frame is finished — creep under the finishes and the floors above, and the thick columns' slower drying, most of which comes after the core's thinner walls have done theirs. Structural form

The arm connected late

An outrigger is often left unconnected until a concrete building is finished, so that the columns and the core can shorten by their different amounts without it. Most of their difference has not happened yet. Three-quarters of fifty years' differential shortening arrives after the frame tops out, and an arm connected then ends up carrying 3.5 MN of it — 60 per cent of what the design wind puts into the same arm, permanently, and in the same direction on both sides of the core. The connection date is the largest load the arm has, and a stiffer arm collects it faster than it collects the wind.

A branch braced along its length holds the riser to a floor. Elevation along the branch: a water-filled DN100 riser guided at every floor of the eight-storey building, with a DN50 branch taken off 500 mm below the first floor's slab and run 2.0 m to a brace on the slab above. The riser leans with the storey's drift between its guides; the branch's brace holds the branch's far end to its slab. Under the building's two-way record the riser alone carries 2.8 N/mm² at the tee's height. With the branch braced so that it cannot slide along its length, it becomes a strut tying the riser to the slab: the riser carries 71 N/mm² at the tee and the branch 10. Let the branch slide at its brace and the riser is back to 4.3, while the branch, now turned by the riser's lean, carries 54. Dynamics

The branch that holds the riser to a floor

A riser guided at every floor leans with each storey's drift and is barely bent by it. Take a branch off it and brace the branch to a slab, and the branch becomes a strut that holds the riser to that slab partway up the storey. The riser, which was carrying 3 N/mm², carries 71 at the tee. Let the branch slide at its brace and the riser is spared, but the branch is then bent by the riser's lean. The lean has to go somewhere, and the brace decides where.

The water that rises after the basement is finished pushes on its slab first. Section through a line of columns of a 20 × 30 m basement dug 9 m, its 0.9 m slab held down at six columns and by 8 storeys above, designed for a water table 3 m below the ground. The water table as designed is 3 m below the ground, a 6 m head under the slab; dashed, the same water risen 1.0 m. The slab bows up between its columns and walls under the uplift less its own weight (exaggerated). As designed, the building holds itself down at 0.65 of its weight's capacity, the slab is at 0.37 of its bending strength and its cracks are 0.140 mm against the 0.200 mm long set for every crack in concrete that must keep water out. With the water 1.0 m higher: 0.76, 0.45, and 0.176 mm against the same 0.200. Equilibrium

The basement that leaks before it floats

A water table that rises after a basement is finished is a load that grows through the building's life, and the building's flotation check is the last thing it troubles. A metre of rise adds a sixth to the uplift on the whole building but over a quarter to the net load on the slab, which carries the water less its own weight. The slab's cracks, which a watertight basement is designed to, are the first thing to run out of room — and the limit for the cracks that pass right through it tightens as the water rises.

The joint's moment takes the sign of the day it was cast. For two 12 m pretensioned beams, 300 mm wide and 700 mm deep, with a 160 mm in-situ slab 1.2 m wide, in 60 per cent humidity, made continuous over their pier by a joint cast with the slab: the moment the joint is asked to carry to hold their ends together, sagging positive, over thirty years, with the joint cast when the beams are 28, 90 and 365 days old; dashed, the joint's cracking moment either way, 140 kN·m. Cast at 28 days the joint is sagged to 211 kN·m; at 90 days it ends at 40; at a year it is hogged to −214. Deflection

The joint cast over the pier

Two pretensioned beams made continuous over a pier by a joint cast with the slab have ends that are still turning when the joint goes in, and the joint stops them. What it is then asked to carry depends on the day it is cast. At four weeks the beams' creep is still lifting their ends and the joint is sagged to half as much again as its cracking moment. At a year the beams have nearly stopped and the slab's shrinkage hogs the joint by as much the other way. Cast at about sixteen weeks, it is asked for almost nothing.

Retightened after every storm, the bolts stretch in every storm. The permanent stretch in the worse bolt row of a 500 × 400 × 20 mm base plate with two M24 holding-down bolts in each of two rows, accumulated over ten storms of four cycles to ±170 kN·m, with the nuts retightened after every storm to 200 kN, to the 150 kN they were first given, to the 124 kN the first storm left, or left alone. Left alone, the bolts stretch 0.12 mm in the first storm and not at all after it. Retightened to 150 kN they add 0.12 mm in every storm, 1.25 mm after ten; to 200 kN, 0.43 mm a storm. Retightened only to what the first storm left, they stretch no more than if they had been left alone. Connections

The nut turned after the storm

A preloaded column base that has been through a storm has lost some of its preload, and the obvious repair is to retighten its bolts. Left alone, the bolts stretched once in the first storm and never again; the base settled. Retightened, they are given back the preload the storm could not live with, and the next storm takes it away again by stretching them again. Retightening after every storm turns a base that settles into one that ratchets, a tenth of a millimetre at a time, and the count of storms it has in it is set by the bolt's elongation.

A joint that gives way to creep, two ways. For a 200 m concrete building built a storey every week and fitted out over six months, with an outrigger at 149 m of 1.0 × 10⁸ kN·m a radian connected on day 385: the force in one arm over the years, in MN, connected rigidly, through a friction joint that slides at 2.00 MN, and through a viscous damper of time constant 10 days; dotted, the 5.80 MN the design wind puts into the same arm. Rigid, the arm collects 3.48 MN. The friction joint lets it collect 2.00 MN, reached after 3.7 years, and holds it there for the rest of its life. The damper lets it collect at most 0.08 MN, while the building is being fitted out, and 0.00 after fifty years. Structural form

The arm that slips on purpose

An outrigger connected to a concrete building at topping out goes on collecting the columns' and the core's differential shortening for fifty years. The obvious cure is a joint that lets the arm move under the slow force and holds under the fast one. A friction joint cannot do it — once creep has brought it to its slip load it has nothing left on one side of the core, and a joint strong enough to hold the wind is never reached by the creep at all. A viscous damper can, because its force depends on how fast it is pushed rather than how far.

The moment the law lets go. The response of a structure of one mode with 1 per cent damping and a tuned mass of 2 per cent of its mass, its spring cancelled by an actuator held to 0.50 of the applied force and a stroke of 1.50 times the passive mass's, per unit static deflection, under a steady harmonic force at 0.90 of the structure's frequency, through a health check failing after sixty periods, when the actuator lets go and the mass is left on its own spring. With the law running the structure moves 4.63; left to the passive mass in a steady state it would move 6.97. In the cycles just after the switch it moves 8.78, more than either: the free mass's large stroke is handed to a spring that holds it at a frequency the forcing is not at, and the two beat before the passive state settles. Dynamics

The switch that hands the mass back

An actuated tuned mass that cancels its own spring does far better than the passive mass, and the passive mass is always underneath it, so the obvious safeguard is a switch: when the stroke nears its limit or the controller fails, let go and leave the mass on its spring. The switch does not land on the passive mass. For several periods after it, the structure moves more than it would with the law or with the passive mass alone — up to the passive mass's own worst peak, at frequencies where the passive mass would have been comfortable. Letting go gradually is worse still, and a switch that is slow lets a growing storm through.

Sized for one amplitude, a nonlinear damper damps only a band around it. The damping of a structure with 2.0% of its own and a brace as stiff as the structure, against the storey's amplitude over the amplitude the damper was sized for, on a logarithmic scale, for dampers whose force goes as the velocity to the power α, each sized to the brace's best at the design amplitude. All four give 22.7% there. The linear damper gives it at every amplitude. A tenth of the design amplitude, α = 0.5 gives 6.4%, α = 0.3 1.9% and α = 0.15 1.4%; a hundredth of it, 1.9%, 1.4% and 1.4% — below the structure's own, because the locked brace has stiffened it. Dynamics

The damper sized for the earthquake

A fluid damper whose force goes as its velocity to the power 0.3 is chosen because it caps the force a large earthquake can push through its brace. The same exponent makes its effective size depend on how far it strokes. Sized to its brace's best at the earthquake's amplitude, it adds 20.7% of critical damping there, 5.4% at three-tenths of it, and nothing at all at a tenth — where the brace has locked, the building is stiffer, and the motion its occupants feel meets a resonance that is as sharp as an undamped frame's. Giving half the brace to a linear damper keeps 9.3% under the wind for 1.2 points at the earthquake.

A short leg past the elbow ends the strut and moves the stress. Peak stresses in the two-direction earthquake against the length of the leg past the elbow, for a DN50 branch off a water-filled DN100 riser, its tee 500 mm below the first floor's slab, run 2.0 m to an elbow of 76 mm radius and on to a brace on the slab above: the riser at the tee, the branch at the tee with the welding tee's stress intensification of 1.58, and the elbow with its own of 1.73. Straight and held, the riser carries 71 N/mm² (dashed). With a 100 mm leg it carries 19, the tee 82 and the elbow 146; with 300 mm, 4, 82 and 84; with 1 m, 3, 53 and 39. From a leg of about 400 mm the tee carries more than the elbow. Dynamics

The elbow that takes the strut away

A branch braced to a slab is a strut that holds a guided riser to that slab, and the riser, carrying 3 N/mm² alone, carries 71 at the tee. Turn the branch through an elbow before its brace and the strut is gone with 300 mm of second leg: the riser falls to 4. The storey's lean does not vanish. It bends the first leg and the elbow instead. With the stress intensification the piping rules give each fitting, the elbow carries 146 N/mm² with a 100 mm leg and matches the tee's 82 at 300 mm. Past that the tee governs again. An elbow can rescue the riser, but it cannot rescue a brace on the farther slab, where it reaches 347 N/mm².

Stressed bay by bay, the beam keeps half its secondary moment. The secondary moment along a 4-span beam of 16 + 16 + 16 + 16 m prestressed with 2,400 kN on a parabolic tendon, straight between supports: stressed in one operation, stressed one bay at a time, and bay by bay after creep with a coefficient of 2.0. At the first interior support it is 350 kN·m stressed at once, 164 bay by bay and 307 after creep; at the next, 234, 160 and 216. Internal forces

The beam stressed one bay at a time

A long continuous beam is rarely stressed in one pull. It is cast and stressed a bay at a time, each new length of tendon coupled to the last, and at every stage the structure is a different beam. The secondary moments the finished beam carries are the sum of what each stage did to the beam that existed then — about half of what the one-stage analysis gives — and creep spends the following years taking most of the other half back.

Pinned bases: weaker, and nothing lost to repetition while gravity leads. For a portal 10 m wide and 5 m high, plastic moment 200 kNm in the columns and 200 in the beam, in the plane of the gravity load's peak V·L/Mp and the reversing wind's H·h/Mp: the shakedown boundary (solid) and the collapse boundary under the loads applied once (dashed), on fixed bases and on pinned ones. On pinned bases the two coincide wherever gravity leads, along the beam and combined mechanisms, until the wind reaches about H·h/Mp = 1.6; past that a knee alternates and shakedown falls inside collapse, meeting it again at H·h/Mp = 2 with the wind alone. On fixed bases collapse reaches 8 and 4 and shakedown sits inside it except where the beam's mechanism meets the gravity axis. The dot is 160 kN of gravity at midspan that comes and goes with 60 kN of wind that reverses: its shakedown factor is 0.88 on fixed bases and 0.73 on pinned ones, where it is also the collapse factor. Materials

The base that sends the wind to the knees

A fixed-base portal loses 12 per cent of its load to a wind that reverses, because each knee takes its worst moment from a different storm. Pin the bases and the loss disappears — not because the pinned frame is better, but because its collapse load already contains it. What the bases decide is where the moment goes, and a base that is merely weaker than its column can cost nothing at all, or be made into the part that yields every storm so that nothing else does.

All themes