Geometry beats material — page 16
The wheel that stands below its rail
A crane wheel is drawn pressing on the top of its rail, and a stability check puts the load there, 391 mm above the girder's shear centre. A cylindrical wheel on a crowned rail head does not press there when the girder twists. It presses above the centre of the crown, and on a 500 mm crown that centre is 109 mm below the shear centre. On an 8 m runway girder the difference is a critical wheel load of 427 kN against 225, and a twist under a rail laid 10 mm off the web of 0.8 degrees against 2.9.
The bow that points the wrong way round
A horizontal tube strut bowed upward by the sag its own weight would give it stays a two-force member from 40 kN to its Euler load. Turn the same bow fifteen degrees off vertical and the top of that window drops to 266 kN; turn it on its side and the window is 50 to 209, worse than a straight tube's. The tube is round, so its gap is a vector and its kern a disc, and a bow's sideways part has nothing in the weight's plane to cancel it. The plane of the bow needs to be found to a few tens of degrees, not to one — and a tube left lying on the floor is found at the worst angle short of upside down.
The ground that holds the tube round
A thin steel tube bent along its length flattens into an oval, and Brazier's limit — 796 kN·m for a 1.2 m tube with a 2.5 mm wall — is where the flattening wins. Bury it, and the soil pressing on its sides resists every millimetre of that oval. In ground as stiff as an ordinary compacted fill the limit rises sixteenfold, far past the moment at which the wall itself buckles, so a buried tube is never governed by Brazier at all. What the ground decides instead is the oval the cover's own weight makes before anything bends, and that is set by the soil and hardly by the tube.
The post that hands the shear across
Two web openings side by side are usually staggered, one high for a duct and the next low for a pipe. Each is an offset hole whose deep tee is on the opposite side from its neighbour's, so the strip of web between them has to move most of the shear from the bottom of the beam to the top. Two 300 mm holes a diameter and a half apart, staggered 50 mm each way, leave a post that fails at 3.3 times the load where the same holes in line leave one that outlasts the holes at 5.8 — and the post governs all the way to mid-span, where the shear it hands across has gone and the step in the top tees' thrust has taken its place.