Outrigger — the series
-
The arm that makes the columns work
The perimeter columns of a tall building are already there, already carrying gravity, and already the furthest thing from the centre. They take almost none of the overturning, because a floor slab transmits shear and not moment — and one storey-deep arm at the right height changes that by nearly a half.
-
What the second arm is worth
One outrigger at its best height removes five sixths of a tall core's drift, which sounds like the end of the argument. A second removes half of what is left, a third half of that, and each of them costs a storey of the most valuable floor area in the building — so the question is not where to put an outrigger but how many the arithmetic still justifies.
-
The arm that ignores the shape of the wind
The outrigger arithmetic is usually done for a wind that is the same at every height, and real wind is not: it grows with height, and an earthquake's first mode loads a building as a triangle. The natural guess is that a load concentrated towards the top moves the best place for the arm. It barely does. Put the same total wind on a 200 m core as a uniform load, a power-law wind and a triangle, and the best level moves by just over one per cent of the height. What moves is the force in the arm — half as much again under the triangle — and how far the top goes, while the arm's own stiffness shifts its best level thirty times as far as the wind's shape does.
-
The arm connected late
An outrigger is often left unconnected until a concrete building is finished, so that the columns and the core can shorten by their different amounts without it. Most of their difference has not happened yet. Three-quarters of fifty years' differential shortening arrives after the frame tops out, and an arm connected then ends up carrying 3.5 MN of it — 60 per cent of what the design wind puts into the same arm, permanently, and in the same direction on both sides of the core. The connection date is the largest load the arm has, and a stiffer arm collects it faster than it collects the wind.
-
The arm that slips on purpose
An outrigger connected to a concrete building at topping out goes on collecting the columns' and the core's differential shortening for fifty years. The obvious cure is a joint that lets the arm move under the slow force and holds under the fast one. A friction joint cannot do it — once creep has brought it to its slip load it has nothing left on one side of the core, and a joint strong enough to hold the wind is never reached by the creep at all. A viscous damper can, because its force depends on how fast it is pushed rather than how far.
-
The arm that is reset by hand
An outrigger connected to a concrete building at topping out collects the core's and the columns' differential creep for fifty years, 3.48 MN in each arm against a design wind of 5.80. A damper lets the creep through and stops the wind, but it is a machine. The older answer is a joint closed with shims and opened every few years to take the creep out. Three visits, at one, three and ten years, hold the arm below 1.40 MN, and spaced like the creep they do it with roughly equal thicknesses of shim each time. Evenly spaced, the same three visits hold 2.48. And a visit that is missed costs exactly the creep it was there to remove.
-
The arm that calls for its own visit
An outrigger connected to a concrete building collects the core's and the columns' differential creep, and re-shimming its joint every few years lets that force go. Dates on a drawing are a guess at how fast the building will creep. A load cell in the joint replaces the guess: re-shim whenever it reads 1.40 MN and three visits, at one, four and twenty-three years, hold the arm there whatever the building does. A building that creeps 60 per cent more than predicted needs a fourth visit; the dated schedule lets it reach 2.30 MN. Holding a tenth of the wind takes eight visits, three in the first thirteen months, and a contractor who can come within weeks.