The further it deflects, the harder it pulls back
The further it deflects, the harder it pulls back. Total load against midspan sag for a 30 m cable of 1000 mm² prestressed to 500 kN, carrying 5 kN/m. The cubic H³ − T₀H² − w²L²EA/24 = 0 was bisected at every point of the curve, so the sag at the full 150 kN is 0.740 m rather than the 1.125 m the flat-cable formula WL/8T₀ gives — the straight dashed line, which is the tangent to this curve at the origin and nothing more. Its slope is the initial stiffness 8T₀/L = 133.3 kN/m; at the marked point the tangent has reached 341.2 kN/m, 2.56 times as stiff, and the horizontal component of the tension has risen from 500 kN to 760 kN. Nothing about the steel changed. The geometry got better at the job.
13 essays call
cable-stiffness. The drawing above is what it returns with no arguments at all; every
call below passes it something, because a placement that passes nothing draws whichever
member of the family the generator happens to default to rather than the one its essay
argues about.
Where it is called
Changing this generator changes every one of these figures.
The stiffness that comes from the shape
A cable has no bending stiffness whatever, and it still holds up a roof. What resists the load is the change of its own geometry, so its stiffness is a function of the tension already in it — and prestress buys stiffness that no change of material could.
The forces that are there with nothing applied
Maxwell's count is the difference between two dimensions, and it knows neither of them separately. A frame can satisfy it exactly and still both fold and be prestressable — and when it does, the second of those is what stops the first.
Held by something that goes soft
A guy is a cable, so it has no stiffness of its own — what resists a mast's movement is the guy's geometry changing, and how much of that there is depends on the tension already in it. Wind pushes the mast towards the leeward guy, which is the one losing tension.
The cable that is a spring
A suspension bridge's cable is a funicular — it takes the shape the load gives it, and the deck's job is to make the load one that shape is right for. A stayed deck is not that at all. Its cables are straight, each reaches the deck at one point, and every one of them behaves as an inclined spring.
Held up by the air inside
A membrane has no bending stiffness at all, so the only thing that can hold it in tension is a pressure difference. The pressure needed to hold up a roof is smaller than the pressure a closed door makes — and the same pressure arrives at the foundation as hundreds of tonnes of uplift.
Two curvatures of opposite sign
A single family of cables is not a structure. It is a mechanism that takes whatever shape the load asks for, and it will do that under any load pattern it was not tensioned for. Cross it with a second family curved the other way, pull the two against each other, and the pair becomes stiff — with no bending anywhere and no material property involved in the stiffness at all.
The deck that is its own cable
Every other cable structure hangs something from the cable. A stressed ribbon hangs nothing — the walking surface is the catenary, laid at a fiftieth of the span rather than a tenth, because a footbridge has to be walkable. That one decision hands the abutments six and a quarter times the entire weight of the bridge.
The force read off a frequency
Nothing can measure the tension in a stay cable directly — there is no gauge, no accessible end and no place to put a load cell. What there is, is a member whose frequencies are an arithmetic progression whose spacing is the square root of its own tension, so a phone taped to it for thirty seconds returns the force.
The pier that carries only the difference
A stressed ribbon continued over a pier pulls on it from both sides, and under its own weight the two pulls cancel. Load one span and they do not: the pier is asked for the difference, nearly ten meganewtons for a crowd on one of two hundred-metre spans. Whether it gives it depends on its stiffness against a number the ribbon supplies itself, and whatever the pier does not carry, the ribbon turns into movement — a third of a metre of extra sag in the loaded span and a fifth of a metre of rise in the empty one.
The tendon that pulls before the deck arrives
A stressed ribbon is hung one span at a time, and the obvious fear is the stage at which one span carries its deck and the next does not: the pier between them asked for a whole span's thrust. It is not asked for that, because tendons cut to the finished length are already stretched across the empty span and pulling. For two 100 m spans at a fiftieth, the rigid pier's stage force is 4,109 kN against a crowd's 9,440 — unless the tendons were sized generously, when the stage overtakes the crowd.
The strand in the sun beside the strand in the shade
Halfway through hanging a stressed ribbon, one span is a sagging cable full of segments and the next is bare tendon stretched nearly straight, and the pier between them carries the difference of their pulls. A warm day takes tension off both — and at the flat sag a ribbon is laid at, the hung span is so nearly all stretch that it loses three quarters of what the bare one does. What moves the pier is not the weather but the shade: strand in the sun beside strand under concrete, 35 kN on the pier for every degree between them. No sun slackens the bare tendon. The hour does change something else, which is the level the joints are cast at.
The span cast in the afternoon
A stressed ribbon's joints are cast on whatever day the programme reaches them, and a span cast on a warm afternoon sets around strand that has lengthened in the sun. It cools that night as a concrete band eleven times stiffer than the strand, and the band does not stretch back as the strand would have. On a ribbon with a sag of 2 per cent, a span cast 20 °C warmer than its neighbour ends 72 mm higher than it was set and leaves 713 kN on the pier between them — a seventh of what a crowd on one span puts there. On a flatter ribbon the same afternoon costs more than the crowd. The difference between the two spans is the strand's flexibility against the band's, and only the elastic part of it differs; the part that comes from the sag is the same for both.
The younger span catches up
Close one span of a stressed ribbon a month before its neighbour and the older band has already shortened when the younger arrives, by a difference that ought to keep working on the pier between them. It does not. The younger span shortens faster and closes most of the gap within a year, and what looked like a grievance that never stops growing is at its largest on the day it begins. What it leaves is small, and it stays, because the part of a ribbon that holds it is a sag, and a sag does not creep.