A three-pinned arch, rise 2.6 on span 9
A three-pinned arch, rise 2.6 on span 9. A three-pinned arch under a uniform load. One moment equation about the crown hinge gives a horizontal thrust of 23.37, with no stiffness and no assumption about the section. The thrust line lands on the axis everywhere, so there is no bending anywhere in the arch.
17 essays call
arch-thrust. The drawing above is what it returns with no arguments at all; every
call below passes it something, because a placement that passes nothing draws whichever
member of the family the generator happens to default to rather than the one its essay
argues about.
Where it is called
Changing this generator changes every one of these figures.
The equation that is not new, and the three that are
A plane free body yields exactly three independent equations. Most attempts at a fourth are one of the first three wearing different clothes — and on a beam under vertical load, one of the three is already saying nothing.
The hinge put in on purpose
An arch with two pinned feet cannot be solved by statics. Add a third hinge at the crown — deliberately weakening it — and the whole structure falls out of one moment equation.
The line that must stay inside
A masonry arch does not stand because its shape is right. It stands because some line of compression can be drawn inside the stonework — any one will do, and there are infinitely many to choose from.
The roof that jumps
Every stability failure in this collection so far has been a bifurcation — a straight thing discovering it can be bent. A shallow frame does something else entirely. It stays perfectly symmetric, deforms steadily, and at some point the load it can carry starts to fall while it is still moving in the direction it was pushed.
The surface that carries by being curved
A flat plate spends its thickness on a lever arm of a few millimetres. Curve the same sheet and the load is carried in the surface itself, at a thirtieth of the thickness — and the entire bill is presented at the edges.
The deck is not there to carry the load
A cable takes the shape of whatever is on it, which is exactly the problem — under a point load its shape is a kink, and a kink is not a road. The stiffening girder exists to spread the load until what reaches the cable is something the cable's own shape is right for.
The arch that leans instead of squashing
A masonry arch is asked whether a line of thrust fits inside it. A steel rib is asked a different question entirely: it is a column carrying an axial force along its whole length, and the mode it buckles in puts one half up and the other half down while the crown moves sideways.
The thrust that never reaches the ground
The arches so far have all ended at the same sentence — the foundation is where an arch is really decided. A tie changes the sentence without changing the arithmetic: the horizontal force is still there, still the same size, and it now closes on itself through a bar at deck level.
The weight that makes it safer
Every load in this collection makes a structure worse. A pinnacle does not. A masonry pier fails when the line of compression leaves the stonework, and adding weight at the top rotates that line back towards the vertical without adding anything the pier cannot carry — so the stone is not being strengthened, it is being aimed.
The arch that gets shorter
A parabolic arch under a uniform load is funicular, so the perfect solution gives it no bending at all. Then the rib shortens under its own thrust by a tenth of a per cent, and every kilonewton-metre of moment the arch will ever carry comes from that.
Cross the hangers and the bending goes
A tied arch with vertical hangers is a Vierendeel frame with a curved top chord — it has no truss action at all, so a load on half the span is carried by bending. Incline the hangers so they cross and the same two chords become a truss.
The weight that bends a rib it cannot bend
A parabolic rib carries its own uniform dead load as pure thrust, with no bending in it at all. Put a live load on half the span and the rib bends in the shape of its own buckling mode from the first kilonewton, and the whole thrust, most of it from the dead load, multiplies that bending. The rib never reaches its buckling load. It yields well short of it, at a load its first-order check says it can carry.
The springings that make shortening worse
Fixing an arch at its springings is the stiffer, cheaper and usual way to build one in concrete, and it makes the arch six times as sensitive to its own shortening. The thrust it loses acts at the elastic centre, two thirds of the way up, so the moment lands at the springings as well as the crown, twice as large and the other way round — at the section the fixed arch is designed at, not away from it.
The abutment that spreads before it turns
A fixed arch is fixed only if its abutments hold still, and they have two ways not to. Turning releases the springing moment, but slowly: an abutment has to be a hundred times the rib's EI/L to hold nine tenths of it, and a footing on stiff clay under a slender concrete rib already is. Spreading does the opposite. The rib's own shortening is worth 13.6 mm of spread, so an abutment that gives 7 mm a side under the thrust doubles every secondary moment in the arch — and a footing on dense sand gives 8.
The rib that cannot lean on its own tie
A free arch rib under a half-span live load bends in the shape of its own buckling mode, and its thrust amplifies the bending more than twofold. Hang a deck from the same rib on vertical hangers and close the thrust in the deck, and the amplification disappears: the thrust and the tie's pull move together, so the couple they make keeps its lever arm, and the only second-order term left is the small difference between the rib's deflection and the deck's. The critical load rises sixteenfold, and the deck's share of the bending is simply its share of the stiffness.
The jacks the arch forgets
Jack a fixed concrete arch's abutments apart before the crown is closed, by exactly the gap its thrust and its footings open on the day, and the springings start with no moment at all. A century later they carry 173 kN·m — half as much again as the 112 the jacks were set to remove. The thrust's own moment never relaxes; the jacks' correction does, as the rib creeps; and shrinkage and the ground's consolidation arrive after the jacks have gone. No single setting cancels movements that run on different clocks.
The arch that waits with its hinges open
A concrete arch fixed on the day it is struck has to restrain every millimetre its rib creeps and shrinks and its ground settles for the rest of its life, and jacking it again a year later cannot make it forget the year before. Struck as a three-hinged arch and left that way, it takes the fastest part of every movement for nothing, because a determinate arch has no moment to spend on a change of length. Closed at a year it ends the century with half the springing moment of the arch fixed at striking, and a third less than the arch jacked again on the same date. The price is a crown that has dropped 78 mm while it waited, and a rib that is no longer the shape of its own thrust.