Shear connector — where it appears
Named by 5 essays across one field — each of them below, with the objects they name alongside it.
Half the studs, and most of the beam
Bonding two layers together quadruples the stiffness of the pair. A real connection is a row of studs that deform, so the layers slide a little and the beam sits between the two answers — but not halfway between, and the number that decides where is a single dimensionless group.
The connection is busiest where the beam is not
A composite beam's studs are spaced evenly along it and the demand on them is not even at all. It peaks at the supports, where the bending stress is nothing, and falls to zero at mid-span, where the section is working hardest — so the connection is designed from a diagram nobody looks at.
The slip the plastic moment asks of the studs
A composite beam with half the studs that full interaction needs still has 85 per cent of the full plastic moment, because the slab's compression block simply gets thinner and the steel finds its own neutral axis. That is the stress-block answer, and it assumes every stud slips as far as the beam asks. Follow the slip along the beam and the end studs of a 12 m beam need 6.6 mm to reach nine tenths of that moment and 9 mm to reach 95 per cent — past the 6 mm a stud is trusted to give. Require 6 mm and the Eurocode's minimum degree of shear connection comes out of the arithmetic, slope and all.
The same studs, moved to where the slip is
A composite beam with half the studs full interaction needs reaches 85 per cent of the full plastic moment, if its end studs can slip as far as the beam asks — nearly 9 mm on a 12 m span, past the 6 mm a stud is trusted to give. Keep the same nineteen studs and crowd them toward the supports, and the end studs need 4.4 mm. Nothing about the beam's strength changes; what changes is how soon the slab's force builds up, and the least connection the slip allows falls from 0.69 to 0.40.
The slip that peaks where the moment turns
A simply supported composite beam slips most at its supports, and its studs are crowded there. Make the same beam continuous over a middle support and the slip peaks twice: at the end support, and again, just as hard and the other way, at the point of contraflexure — not over the middle support, where the shear is largest but the slip falls to nothing. Studs graded toward the supports, as a simple span's would be, miss the second peak and buy a tenth; graded to the slip they buy more than a third. And the hogging region cannot give its studs away to the span, because its edge is where the second peak is.
Named alongside it
The objects these essays reach for when they reach for this one.
Composite actionPartial interactionSlipDuctilityDeflectionMoment redistributionServiceabilityShear connectionShear flowStiffnessCompatibilityContinuous beam