Two blows on three foundations. The movement of a 150 tonne block struck by a hammer delivering 18 kN·s, twice, 0.75 s apart. On soil at 12.5 Hz with the 47 per cent of damping a half-space radiates, the block moves 0.86 mm and is still before the second blow. On the same soil over shallow rock, with 5 per cent, it moves 1.42 mm and rings for the whole interval. On springs at 4.0 Hz it moves 4.42 mm, and its ringing has not died when the second blow arrives. The peak force passed to the ground is 1.34, 1.32 and 0.42 MN: the heavily damped block and the lightly damped one pass almost the same force. Dynamics

The blow that has no frequency

A forge hammer does not shake its foundation; it strikes it. The transmissibility curve every isolation design is drawn on has nothing to say about a blow, and the rules it teaches mislead. The force a struck block passes to the ground is least at a quarter of critical damping, not the most; five per cent and forty-seven pass almost the same; and the springs that soften every blow can bring the block down to the hammer's own rate and make a train of blows ring four times as high as one.

The same blow, three seats under the anvil. The movement of the block — the part of a 150 t hammer foundation, 30 t of it the anvil, that lies below the pad — after one blow of 18 kN·s on the anvil, over three periods of the whole foundation on soil (12.5 Hz, damping 0.47). Rigid seat: largest movement 0.86 mm at 16 ms; pad at 4.0 times: largest movement 1.14 mm at 13 ms; pad tuned to the foundation: largest movement 1.18 mm at 35 ms. On the pad at 4.0 times the block rides the anvil's ringing: a ripple at the anvil's own frequency on top of the foundation's swing, whose first crest lands near the swing's peak. On the tuned pad the block receives the blow as one slow push, peaks later and higher, and then goes on ringing long after the rigid seat has settled, because the mode in which anvil and block swing against each other is damped by the pad and hardly at all by the ground. Dynamics

The pad that makes the blow worse

A forge hammer's anvil sits on a pad on its foundation block, and the pad looks like isolation: a spring between the blow and everything below it. For the block it is the opposite. Every pad an anvil can sit on makes the block move more than a rigid seat would, by half again when the pad is tuned near the foundation, and what the pad buys instead is a smaller force under the anvil. The hope that a tuned pad could act as a tuned mass works only against a train of blows, and only at a softness the anvil cannot live with.

The strain-energy route halves the sag. The midpoint deflection of a cable 10.0 m long, pretensioned to 60 kN, with an axial stiffness EA of 64 MN, loaded across its span at midpoint, against the load, found three ways. Solid: the deflection itself, from the cable's geometry; the dots, the derivative of the complementary energy with respect to the load, lie on it. Dashed: the derivative of the strain energy. Dotted: the pretension alone, as if the cable's tension did not grow. At 10.0 kN the cable sags 212 mm; the strain-energy route gives 107 mm, 0.51 of it, and the pretension alone 417 mm. At 20.0 kN: 294, 128 and 833 mm. The strain-energy route understates the deflection of a member that stiffens by the same mechanism that made it overstate one that softens. Deflection

The sag the strain energy halves

The derivative of the strain energy overstates the deflection of a member that softens. Turn the curve the other way up — a cable that grows stiffer as it sags, a hanger that takes up its play — and the same derivative understates it: by half for a pretensioned cable carrying a modest load, by two thirds for one with no pretension, and by the whole of the slack for a member that has any. The error is one ratio in both directions, and the least-work shortcut built on it hands the load to the member that stiffens.

One actuator, a tower and a floor. The peak amplification of a mode with 1 per cent damping under velocity feedback of gain 0.10, against the mode's frequency on a logarithmic scale, for control loops whose delay is 10, 25, 50 milliseconds. The dotted line is the mode without control, 50. With 10 ms: 4.6 at 0.2 Hz, 4.5 at 2 Hz and 5.0 at 8 Hz; with 25 ms: 4.6 at 0.2 Hz, 4.6 at 2 Hz and 19.0 at 8 Hz, unstable from 9.8 Hz; with 50 ms: 4.5 at 0.2 Hz, 5.3 at 2 Hz and unstable at 8 Hz, unstable from 4.9 Hz. A delay is a fixed time and a period is not, so the same loop that damps a tall building's sway is too late for a floor. Dynamics

The actuator that arrives late

A tuned mass damps a structure because its force arrives a quarter of a cycle behind the motion. Replace the mass with an actuator told to push against the structure's velocity, and the same quarter-cycle is fatal: the push that was damping becomes stiffness, the stiffness becomes a source of energy, and a gain that would have cut the response tenfold makes the structure vibrate by itself. The delay is a few hundredths of a second, which is nothing to a tower and everything to a floor.

A downward pressure that pulls the corners up. The nodal forces that do the same work as a uniform pressure on one eight-node serendipity quadrilateral, as fractions of the whole load, each node's share being the integral of its shape function over the element. The shares are −1/12, −1/12, −1/12, −1/12, 1/3, 1/3, 1/3, 1/3 at its eight nodes, adding up to one. The four corner forces are negative: the pressure pushes down and the work-equivalent forces at the corners pull up. Equilibrium

The corners the pressure pulls up

Replace a uniform pressure on a beam element by its work-equivalent nodal loads and the ends acquire couples the resultant cannot see. Do the same on an eight-node plate element and the corners acquire forces pointing the wrong way: a pressure pushing down is represented by the corners being pulled up, a twelfth of the load each. It is correct, it is the vector that makes the solution the best one available, and it is the reason a printout of nodal forces is not a picture of where a load goes.

What the actuator pushes against decides its limit. The largest feedback gain, as the damping it would add to the bare mode, at which the loop stays stable, against the delay as a fraction of the period, on a logarithmic scale, for a mode of 1.00 per cent damping carrying a tuned mass of 2.00 per cent of its modal mass at Den Hartog's tuning. Pushing against the ground, fed by the structure's velocity: 2.41 at a delay of 0.05, 0.25 at 0.2. Pushing against the tuned mass, fed by the same velocity: 0.0156 at almost no delay, rising to 0.091 at a quarter of a period. Pushing against the tuned mass, fed by the velocity across it: unlimited with no delay, 0.048 at 0.05, 0.0073 at 0.2. Dynamics

The actuator that pushes against the mass

An actuator that damps a structure by feeding back its velocity has to push against something. Against the ground, it is stable up to large gains until a delay of a quarter period removes its damping. Against a tuned mass — the arrangement meant to keep a passive damper underneath — the same feedback goes unstable at a gain of a per cent and a half with no delay at all, makes the structure worse than the passive mass at every gain below that, and drives the mass three or four times as far. What limits it is not when it acts but what it pushes against.

A fuse caps the force the strand ever sees. The force in the tendon line of a 2.0 × 8.0 m rocking wall of 400 kN, prestressed to 600 kN, with bars of 400 kN, against the opening of the base under the tendon, loaded to 79 mm and back: the strand alone, 20 kN/mm yielding at 1,370 kN, and the strand with a fuse yielding at 1,000 kN with a stiffness of 500 kN/mm in series, together 19.2 kN/mm and capped at 1,000 kN. The strand alone yields at 39 mm and is slack at upright after any opening past 69 mm; the fused line yields at 21 mm and is slack past 52 mm. In the fused line the strand carries the line's force and never more than 1,000 kN, so it stays elastic and all the plastic stretch, 58 mm at this opening, is in the fuse. Dynamics

The fuse that protects the strand and not the wall

A rocking wall's tendon loses its prestress when it yields, so give it a fuse: a short link in series that yields first and is replaced afterwards. The strand then never passes 1,000 kN and stays elastic. But the fuse caps the restoring moment lower, so under the same 1.5 g pulse the wall rocks to 110 mrad instead of 89, and the line loses all its prestress just as the strand did. A new fuse gives the prestress back; the bars' stretch stays, and the next pulse takes the wall to 134 mrad.

Every law with the spring cancelled, stroke against peak. Each point is one law for a structure of one mode with 1.0 per cent damping and a tuned mass of 2.0 per cent of its mass, tuned and damped by Den Hartog's rules with the mass's spring cancelled, its structure-velocity and relative-velocity gains on a grid: its peak response against the mass's peak stroke, both as multiples of the static deflection. Filled, the 731 laws that need no more than 0.50 of the applied force; faint, the 730 that need more. The passive mass is the ring, at 45.3 and 8.72. The lower edge of the filled cloud is the best a law of this kind can do for each stroke; at the passive stroke it is 7.38, and it falls steeply as the mass is given more room. Dynamics

The law that throws the tuning away

An actuator that pushes against a tuned mass and listens only to the structure pumps the mass's own mode. A law that also listens to the mass can be made safe in one move — cancel the mass's spring, so that it has no mode to pump — and every such law is stable. But cancelling the spring throws away the tuning that made the mass useful, and the actuator has to earn it back: below a third of the force on the structure, the law is worse than the passive mass it replaced. What it buys above that, it buys mostly by letting the mass travel further.

Where a bending stem sheds its compaction pressure. The share of the rigid build-up's pressure shed at each depth by a cantilever stem 3 m high, bending stiffness 67,500 kN·m² a metre (a concrete stem about 300 mm thick), backfilled in 250 mm lifts of soil at 20 kN/m³ and 30°, each compacted by a roller of 60 kN a metre: nothing at the base, which does not move; little in the top lift, which nothing is placed after; most, 20 per cent, at 0.9 m down, where the pressure was locked early and the stem went on moving away from it. Equilibrium

The stem that bends away from the roller

A roller compacting backfill against a wall leaves a lateral pressure behind it that the soil's weight alone would never make, and for a wall that cannot move that residual is Ingold's envelope. A cantilever stem moves as the fill goes up, and a residual locked in against it relaxes as the stem bends away. But not everywhere: the base never moves, so it keeps its pressure, and the last lifts have nothing placed after them, so they keep theirs. A 300 mm stem sheds an eighth of the rigid wall's base moment and the softest stem a third — never more, because the two ends of the stem are where the relief cannot reach.

Past a wall ratio of 2.22, a thicker tube gains nothing more. The most autofrettage can raise a thick cylinder's elastic pressure, as a multiple of its first-yield pressure, against its wall ratio b/a. Yielding the whole wall would buy σy ln k ÷ py (faint), which keeps rising; the release caps it at 1 + β, where β is the reverse yield strength over the forward one. With β = 1.0 the two meet at b/a = 2.22, and the gain is 2.00 for every thicker wall; with β = 0.7 the two meet at b/a = 1.80, and the gain is 1.70 for every thicker wall; with β = 0.5 the two meet at b/a = 1.55, and the gain is 1.50 for every thicker wall. Thinner walls than that can be yielded right through and gain less. Materials

The overstrain the release gives back

A thick tube is pressurised past yield once, at the factory, so that releasing the pressure leaves its bore in compression and the working pressure must overcome that before it does any harm. The obvious rule is to overstrain as far as possible — right through the wall. For a tube whose outside is more than 2.22 times its bore that is wrong: the release itself reverses the bore past yield, and every newton of overstrain beyond twice the first-yield pressure is given back on the way down. The best overstrain stops part-way through the wall, and a steel that yields early in reverse stops it sooner.

Keep most of the spring and no law beats the mass that has no law. The least peak response of a structure of one mode with 1 per cent damping and a tuned mass of 2 per cent of its mass, an actuator between them held to 0.50 of the applied force and its stroke to 1.50 times the passive mass's, against the share of the tuning spring the law leaves in place (κ): 0.00: 4.65, 0.10: 4.81, 0.20: 5.14, 0.30: 5.02, 0.40: 5.55, 0.50: 5.67, 0.60: 6.41, 0.70: 7.77, 0.80: 7.58, 0.85: 9.88, 0.90: 12.24, 0.95: 10.25, 1.00: 8.81. The passive mass alone peaks at 8.72 (dashed). Cancelling the whole spring buys the most; every share kept costs some of it, and from about 0.85 upward no stable law under these limits does as well as no law at all — with the whole spring kept the best is the passive mass with a touch of extra damping, 8.81. Dynamics

Half a spring is neither tuning nor freedom

An actuator pushing on a tuned mass is safe if its law cancels the mass's spring, and it then needs half the applied force to do much better than the passive mass. The obvious compromise is to cancel only part of the spring, keeping some of the tuning in case the law is not enough. Search every law in the family and the compromise turns out to be the worst choice available: each share of spring kept costs performance and makes more of the laws unstable, and from about 85 per cent kept upward no stable law under the same limits does as well as the mass with no law at all.

A counterweight that follows the jib leaves only the payload, halved. The moment in the mast of a crane whose 50 m jib weighs 300 kN and luffs between 15° and 85°, lifting 60 kN at its tip, against the luffing angle, with a counterweight linked to the luff so that it balances the jib and half the payload at every angle: 1,449 kN·m loaded and −1,449 empty at 15°, 131 and −131 at 85°. What is left is the payload's moment less the half the counterweight was set for, plus or minus 1,449 kN·m at most, against 4,744 with a fixed counterweight. Equilibrium

The counterweight that follows the jib

A counterweight that stays put balances one position and leaves the mast a moment at every other. Make it move and it can balance anything that moves slowly enough to be followed. On a luffing crane the thing that moves most is not the payload but the jib itself, whose own moment about the mast changes more than twice as much through its luff as the payload's ever is — and a counterweight linked to the luff cancels that change exactly. What it cannot cancel is the payload, which leaves the ground in a second. The best any counterweight can do with that is wait halfway, and the mast is left with half the payload's moment at the longest radius, whatever else the counterweight does.

A cambered girder is an arch on its slings. A 40 m precast girder of 11 kN/m, lateral stiffness 2.55 × 10⁵ kN·m², hung 0.90 m below its roll axis, picked 2 per cent of its length in from each end, with 100 mm of camber at mid-length, drawn in elevation with the camber exaggerated. The girder's centre of gravity is two-thirds of the camber above the line through its ends, 67 mm; its lifting points, on the arc 2 per cent in from each end, are 8 mm above it. It rolls about the line through the picks (dashed), so the camber has lifted its centre of gravity 59 mm towards the roll axis: the girder hangs as though its hook were that much lower. Deflection

The camber that lowers the hook

A camber is built into a girder so that it ends up level in the finished structure, and nothing about it matters until then — except on the day it is lifted. A cambered girder hanging from its ends is a shallow arch, its centre of gravity two-thirds of the camber above the line through its lifting points, and it rolls about that line as though its hook were that much lower. On a long precast girder already close to its lifting limit, a hundred millimetres of camber takes the factor of safety against roll from 2.3 to 1.4. The camber grows while the girder waits in the yard, so the same girder becomes harder to lift every week it is stored. Pick it a fifth of its length in from each end and the camber drops out of the problem altogether.

On a flexible tower the full tank is not the worst one. The tower's base shear against how full the tank is, for a 12 m tank holding up to 8 m of water on a 25 m tower: a stiff tower (period 1.20 s with the tank full) and a flexible one (2.50 s), the liquid and tower coupled (solid) and with all the water bolted to the container (dashed). The stiff tower's shear rises all the way to full, 2,141 kN, against 2,728 kN rigid. The flexible tower's peaks at 84% full, 688 kN, and falls to 665 kN full; rigid water says 884 kN, flat from 37% full, because past the spectrum's last corner a heavier mass on the same spring draws the same force. Dynamics

The tank that sloshes the tower

On the ground a tank's liquid splits into a part that moves with the wall and a part that sloshes at its own long period, and the two answers can be added afterwards because they are orders apart. Lift the tank onto a tower and the tower's period moves up towards the sloshing period, the two masses stop being separate, and the system has two modes that belong to neither. Adding the ground answers then overstates the base shear by a third, treating the water as solid by as much again, the wave grows by half, and a flexible tower is worst with the tank about five-sixths full.

Propped before it is filled, the stem keeps the roller's pressure. For a 3 m stem of stiffness 67,500 kN·m² a metre, fixed at its base, propped at its top by a slab cast first, backfilled in 250 mm lifts with a 60 kN/m roller: the lateral pressure on the stem after the last lift, in kPa, against depth — propped at its top before the fill (solid), the same stem as a free cantilever (dashed), a stem too stiff to move (dotted) and the active pressure. The propped stem moves at most 0.15 mm, in its middle, where the free cantilever's top moved 2.61 mm; it relaxes almost nothing, and its pressure lies on the stiff stem's along the whole height — the roller's residual, 27 kPa from half a metre down, four times the active pressure at mid-height. Equilibrium

The prop that holds what the roller left

A basement wall whose ground-floor slab is cast before the backfill spans between its base and the slab, and as the fill is compacted against it the wall bows by a sixth of a millimetre. A free cantilever stem leaned sixteen times as far and shed an eighth of the roller's pressure; the propped wall sheds one per cent. Its base moment falls to a third, which looks like a gain, but the pressure has not gone: the slab now carries 22.6 kN a metre against the 6 an active-pressure design gives it and the 9 of soil at rest.

Two ways to put a bore in compression. For a tube 2.5 times its bore in a 900 N/mm² steel: the stress difference σθ − σr through the wall, as a share of the yield strength, at rest (dashed) and at the working pressure (solid) — for the wall shrunk together from two layers so that every layer's bore yields together at work, and for the same wall autofrettaged to its best overstrain (thin lines). The layered wall carries 540 N/mm², 1.43 times the first-yield pressure, and at rest its bore sits at −0.43 of yield; the autofrettaged wall carries 756, 2.00 times, its bore at rest at −1.00. Materials

The ceiling the bore sets

A thick tube can be put into compression at its bore two ways: overstrain it past yield once and let it spring back, or build it from layers each shrunk on to the one inside. The second never yields the steel at all. Two layers carry 1.43 times a plain tube's pressure where an overstrain carries 2; four layers 1.75; and no number of layers, no overstrain and no combination of the two carries more than twice. The ceiling is not in either method. It is the range the bore's stress swings through, which belongs to the assembled wall, and the floor that range may reach, which belongs to the steel.

When the slab lets go, the stem is a cantilever again. For a 3 m stem of stiffness 67,500 kN·m² a metre, fixed at its base and propped at its top by a slab cast before the fill, backfilled in 250 mm lifts with a 60 kN/m roller: the bending moment down the stem in kN·m a metre, the base's moment positive — propped as the fill left it; after the slab has shrunk 2.08 mm away and gone slack; and with the slab tied to the stem and shrunk 4.5 mm, pulling it; dashed, the stem as a cantilever from the start. Propped, the base carries 26.6. Slack, 69.6, 2.6 times as much and close to the cantilever's 82.9. Tied, 119.9, more than the cantilever ever carried, because the slab that propped the top now pulls it. Equilibrium

The slab that shrinks away from the wall

A basement wall propped by its ground-floor slab before it is backfilled keeps the roller's pressure, and its slab takes it. Then the slab dries. Two millimetres of shrinkage at each end — about a year for a 30 m slab indoors — and a slab that only bears on the wall has let go of it, leaving a stem designed as propped to carry 2.6 times the base moment it was given. Tying the slab into the wall to stop that makes it worse: the slab goes on shrinking and pulls, and the base moment passes the free cantilever's.

The moment the law lets go. The response of a structure of one mode with 1 per cent damping and a tuned mass of 2 per cent of its mass, its spring cancelled by an actuator held to 0.50 of the applied force and a stroke of 1.50 times the passive mass's, per unit static deflection, under a steady harmonic force at 0.90 of the structure's frequency, through a health check failing after sixty periods, when the actuator lets go and the mass is left on its own spring. With the law running the structure moves 4.63; left to the passive mass in a steady state it would move 6.97. In the cycles just after the switch it moves 8.78, more than either: the free mass's large stroke is handed to a spring that holds it at a frequency the forcing is not at, and the two beat before the passive state settles. Dynamics

The switch that hands the mass back

An actuated tuned mass that cancels its own spring does far better than the passive mass, and the passive mass is always underneath it, so the obvious safeguard is a switch: when the stroke nears its limit or the controller fails, let go and leave the mass on its spring. The switch does not land on the passive mass. For several periods after it, the structure moves more than it would with the law or with the passive mass alone — up to the passive mass's own worst peak, at frequencies where the passive mass would have been comfortable. Letting go gradually is worse still, and a switch that is slow lets a growing storm through.

Balancing the payload is a hedge between lifting it and losing it. The mast's design moment over the payload's own moment, against the share of the payload a counterweight driven from the load cell balances, for a crane whose 50 m jib weighs 300 kN, lifting 60 kN at 48.3 m, with a hoisting factor of 1.20 and a rebound factor of 0.50 for a payload let go at once. Lifting off, the mast carries 1.20 less the share balanced; let go, the share balanced plus 0.50, backwards. The larger of the two is least at a share of 0.35, where it is 0.85. The linked counterweight's half gives 1.00; balancing the whole payload gives 1.50, the worst of the three, because a crane balanced for its load is thrown backwards by all of it when the load goes. Equilibrium

The counterweight that knows the load

A counterweight driven from the hoist's load cell can follow the payload as the rope takes it up, so the step at pick-up that defeated every linked counterweight becomes a ramp a motor can keep pace with. Balancing the whole payload is then the worst thing to do with it. A crane balanced for its load is thrown backwards by all of it when the load is let go — 1.5 times the payload's moment with a rebound factor of 0.5, against 1.0 for the linked crane's half. The best share is a hedge between lifting the payload and losing it: 0.35 of it, for 0.85, which buys 18% more at the tip from the same mast.

The same damper behind a lever is best at a larger motion. The damping of one storey with 2% of its own damping and a brace as stiff as the storey, with an α = 0.3 damper sized to its brace's best at the design amplitude with no amplifier, against the storey's amplitude, with the same damper behind stroke amplifiers of ratio 1, 2 and 3. A ratio f makes the damper act on the storey as one f to the power 1 + α larger — 2.46 and 4.17 times — so it locks more, and its band moves up by about f to the power (1 + α)/(1 − α): its best is near 3.8 and 7.5 times the design amplitude. At a hundredth of the design amplitude all three give 1.4%; at the design amplitude 22.7%, 6.4% and 2.3%. Dynamics

The lever that moves the damper and not the band

A damper whose force goes as a low power of its speed is sized for the earthquake and locks in the wind. A toggle or scissor linkage multiplies its stroke, and it seemed it might move the band of amplitudes the damper serves down towards the wind. It cannot. Behind a lever of ratio f the same damper acts on the storey as one f to the power 1 + α larger, so its band moves up, not down; re-sized to the design amplitude, it gives the storey exactly the curve it had without the lever, and what has changed is the damper — a quarter of the size, a third of the force, three times the stroke. What would widen the band is a ratio that grows with the motion, and a toggle has one — until its links lie straight and it locks.

The wire's strength buys the wall. The thinnest wall, as a multiple of the bore, on which a wound tube can carry the ceiling, against the wire's strength over the liner's. Wire as strong as the liner needs 3.01; 1.2 times as strong, 2.30; 1.5 times, 1.69; from about 2.00 times, any wall. Dotted, 2.22: the thinnest wall on which shrunk-on layers of the liner's own steel reach the ceiling, where σy·ln k is twice the first-yield pressure — thinner than the same steel wound, because a layer can carry compression and a wire cannot. Materials

The wire that cannot push

A tube's liner wound with wire under tension is a compound tube of a hundred layers, each shrunk on by its own winding. It reaches the same ceiling, twice the first-yield pressure, and no further, because the bore's range belongs to the whole wall and its floor to the liner's steel. What the wire's strength decides is where the ceiling can be reached at all. A wire cannot be compressed, so a jacket of the liner's own steel needs a wall three times the bore, where shrunk-on layers of the same steel need 2.22; wire half as strong again needs 1.69; wire twice as strong reaches it on any wall. Every turn is wound harder than it will rest, by what all the turns after it take away.

The seasons ride on the shrinkage. How far the slab's end has moved away from the fill since the fill was finished, over six years, for slabs 10, 20, 30 m between walls at 60 per cent humidity, swinging 3.0 K either way each year, propping a 3 m stem fixed at its base, its top held by the slab cast before its fill went up in 250 mm lifts rolled at 60 kN/m. The slab lets go of the stem at 2.08 mm (dashed). 10 m: a seasonal swing of ±0.15 mm on shrinkage reaching 1.28 mm by year six; it still touches the stem in the sixth year. 20 m: a seasonal swing of ±0.30 mm on shrinkage reaching 2.55 mm by year six; it last touches the stem 3.4 years on. 30 m: a seasonal swing of ±0.45 mm on shrinkage reaching 3.83 mm by year six; it last touches the stem 1.3 years on. Equilibrium

The seasons that stop reaching the wall

A ground-floor slab that has shrunk away from the basement wall it propped moves with the seasons as well, a few tenths of a millimetre at each end every year. It looks like a ratchet waiting to happen: each winter the slab presses the stem back into its fill, and each push might lock a little more pressure in. On a 30 m slab it never gets the chance — the seasons ride on a shrinkage ten times larger, and the slab last touches the wall sixteen months after the fill is finished. On a 10 m slab it touches every year for good, and the stem still loses most of its prop.

A scatter of a few per cent in the headways and the rhythm is gone. The damping a 120 m stay at 3,500 kN, 1.01 Hz, over a deck mode at 2.01 Hz damped at 1.0 per cent needs to hold a typical history still, under identical vehicles, each giving the deck the impulse with which a random stream of them every 2.0 s on average gives it an rms of 7.1 mm, arriving every 1.987 s on average — 4 deck periods — against the scatter of their headways (coefficient of variation, logarithmic), from integrating the deck and the stay together over four 1,500 s histories at each point. Exactly regular, 0.99 per cent; scattered by 1 per cent, 0.86 per cent; by 2 per cent, 0.58 per cent; by 5 per cent, 0.13 per cent; at random, 0.05 per cent. The requirement halves at a scatter of 2.2 per cent. Dynamics

The convoy that keeps the deck's time

A deck shaken by traffic is shaken by vehicles, and vehicles arrive with a rhythm of their own. The same lorries that, arriving at random, move a stay's deck by 7 mm rms and ask the stay for six hundredths of a per cent of damping, move it by 20 mm and ask for a whole per cent if they arrive every four deck periods exactly. But the rhythm is fragile in a precise way: scatter the headways by two per cent and half the danger has gone, and the timing that has to be kept is a tenth of the deck's period whatever the headway and however damped the deck. Ordinary traffic is counted by a stay, not timed; a convoy driven by a machine might not be.

A slow release moves the hedge up, and never past half the surge. The best share of the payload for the counterweight to balance, and the mast's design moment over the payload's at that share, against the release time the design can rely on, for the crane lifting 60 kN at 48.3 m, its mast and jib rocking backwards with a period of 2.0 s and a damping ratio of 0.02, with a hoisting factor of 1.20. Let go at once, 0.13 and 1.07; over 1.2 s, 0.36 and 0.84; over 6 s, 0.56 and 0.64. However slow the release, the share cannot pass 0.60, half the hoisting factor, because the payload's own moment is still let go even when its rebound is not. Equilibrium

The release the rope cannot slow

A crane whose counterweight knows the payload balances only a third of it, because a payload can be let go and the crane is then thrown backwards by whatever the counterweight was holding, and half as much again in the rebound. Slow the release and the rebound goes, so the hope was that a device on the rope could slow it. Nothing on the rope can: the rope holds only what the hook holds. How fast a load goes belongs to the payload, and what the crane owns is how fast it answers — its period and its damping. And with no rebound at all, the counterweight still should not balance more than 0.6 of the payload, because the payload's own moment is still let go.