One support too many — page 5
Four corners and a mechanism
The check on a hole in a web adds an axial stress to a local bending stress and compares the sum with the yield stress at one corner. What ends the opening is four hinges arriving together — and the gap between the two is a factor that varies along the span from two and a half to exactly one.
The bay that is cast last
A wall cast on a base cracks in a way the steel controls: more movement gives wider cracks, and reinforcement decides how many. A bay cast between two walls that have already hardened cracks in a way that has nothing to do with how much movement there was — and the threshold that separates a controlled crack from a single wide one is a quantity of steel rather than a limit on anything.
The joint that was chosen
A joint's stiffness decides how a beam's moment divides between its span and its supports, and the two add to a constant. So there is a stiffness at which they are equal, the beam is sized by the smaller of two numbers rather than the larger of one, and the design moment is half what a simple connection leaves behind.
The crack is a strain, not a slope
Angular distortion is what every table of settlement limits is written in, and it is a proxy. What cracks a building is a tensile strain in it, and reading the building as a deep beam says which of two mechanisms supplies it, why hogging is exactly twice as damaging as sagging, and why a horizontal stretch of a few millimetres takes half the capacity away before the settlement starts.