The pier reads the difference between the two spans' temperatures. Contours of the pier force between two 100 m spans at a sag of 2.00 per cent with the deck hung on one, the tendons at 1,100 N/mm² when finished, on a pier of 200,000 kN/m, every half meganewton, over the warming of the hung span's tendons (across) and of the bare tendon's (up) since they were cut. With neither warmer the pier carries 3,080 kN; warming the bare tendon 30 °C alone gives 4,126 kN, the hung span alone 2,342 kN, and both together 3,392 kN. The contours are straight and parallel: the pier gains 35 kN for each degree the bare tendon warms and loses 25 for each degree the hung span does, so a warming both share moves it only 30 per cent as far as the same warming on the bare tendon alone, and what the pier feels is mostly how much warmer one span's strand is than the other's. Structural form

The strand in the sun beside the strand in the shade

Halfway through hanging a stressed ribbon, one span is a sagging cable full of segments and the next is bare tendon stretched nearly straight, and the pier between them carries the difference of their pulls. A warm day takes tension off both — and at the flat sag a ribbon is laid at, the hung span is so nearly all stretch that it loses three quarters of what the bare one does. What moves the pier is not the weather but the shade: strand in the sun beside strand under concrete, 35 kN on the pier for every degree between them. No sun slackens the bare tendon. The hour does change something else, which is the level the joints are cast at.

One ratio decides how much of a row works. The share of n single screws' peaks a row reaches, for rows of 10, 20 and 30 8 mm screws at 45° to the joint, 56 mm apart along the grain, in two 100 mm softwood members of modulus 11,500 N/mm² with 40, 80 and 160 mm of member depth each, and threads peaking at 0.5, 1, 1.5 and 2.5 mm, against one ratio: the slip difference the members' stretch puts between the end screw and the middle one at the row's peak, PL(1/EA₁ + 1/EA₂)/8, over the width of a single screw's curve above nine tenths of its peak. Thirty-six rows fall on one curve: every row with the ratio below 0.3 reaches at least 1.00 of its screws' sum; at a ratio of 1 they reach about 0.96; and the most stretched, at 3.5, 0.72. The colour is the thread's peak slip; a brittler thread has a narrower plateau and lands further right for the same row. Connections

Twenty screws that peak together

A leaning screw reaches its peak at two millimetres of slip and then lets go, so a row of twenty along the grain looks like the long bolted joint again — the end screws past their peak and falling while the middle ones have barely started. Follow the row slip by slip and it is not: in a member of ordinary depth twenty leaning screws carry 98 per cent of twenty times one, against the 74 per cent the effective-number rule allows. What decides it is one ratio — the slip the timber's stretch spreads along the row against the width of a screw's peak — and the rule is right only for a brittle thread in a thin member.

The limit moment goes as the square root of the ring's stiffness, and pressure is part of it. Brazier's limit moment for a steel tube of radius 600 mm and wall 2.5 mm (r/t = 240), as a multiple of its value with no pressure, against the pressure as a multiple of the ring's own buckling pressure, pc = 3D/r³ = 4.07 kPa; positive inside. The dots are the peaks of the moment–curvature path found by minimising the energy at each curvature; the line is √(1 + p/pc). Half pc outside leaves 0.71 of the bending capacity, and the capacity is gone at pc; pc inside gives 1.41, three times pc 2.00. The pressure enters only by adding to the ring's stiffness against the oval, (3D/r³ + p) where it had 3D/r³. Stability

Three kilopascals that halve a tube in bending

A long thin tube in bending flattens until its section can carry no more, at an oval of exactly two ninths of its radius. Put a pressure on it and nothing about that shape changes. What changes is how much bending it takes to get there — as the square root of one plus the pressure over the ring's own buckling pressure — and for a steel tube 1.2 m across with a 2.5 mm wall that unit is 4 kPa. Three kilopascals of suction halve its bending capacity; a fifth of an atmosphere inside doubles it and hands the tube to another failure entirely.

However heavy the chord, ordinary posts cap its share. The heavy chord's share of the shear in a panel of uniform shear in a Vierendeel girder of 2 m panels, 1.5 m deep, against how many times stiffer it is than the light chord, from the one-panel model (lines) and from a whole girder (dots). Splitting by second moment (dashed) runs from 0.5 towards 1. With posts as stiff as the light chord the share is 0.54 at a ratio of 4 and still only 0.55 at 30; posts 4, 16 and 100 times stiffer reach 0.65, 0.80 and 0.93 at 30. The posts, not the chord, set the ceiling. The dots are a twenty-panel girder at its sixth panel, far from both support and load: with ordinary posts 0.50, 0.53, 0.56, 0.60, 0.65, 0.69 at ratios of 1, 2, 4, 10, 20, 30. They follow the model until the heavy chord's own second moment becomes a noticeable part of the girder's — 31 per cent at a ratio of 30 — and it starts to carry the global moment by bending as a beam. Structural form

The heavy chord the posts will not let work

A Vierendeel girder carries its shear as bending in its two chords, and when one chord is four times as stiff as the other the obvious rule gives it four fifths of the shear. With posts as stiff as the light chord it takes 0.56. The heavy chord's end moments have to be carried round each joint by a post, the post bends, and the heavy chord turns with its joints instead of bending between them. No amount of extra steel in that chord takes its share past 0.55 in the middle of a long girder; only the posts can, and they have to be about 150 times as stiff as the light chord to make the rule come true.

Past a wall ratio of 2.22, a thicker tube gains nothing more. The most autofrettage can raise a thick cylinder's elastic pressure, as a multiple of its first-yield pressure, against its wall ratio b/a. Yielding the whole wall would buy σy ln k ÷ py (faint), which keeps rising; the release caps it at 1 + β, where β is the reverse yield strength over the forward one. With β = 1.0 the two meet at b/a = 2.22, and the gain is 2.00 for every thicker wall; with β = 0.7 the two meet at b/a = 1.80, and the gain is 1.70 for every thicker wall; with β = 0.5 the two meet at b/a = 1.55, and the gain is 1.50 for every thicker wall. Thinner walls than that can be yielded right through and gain less. Materials

The overstrain the release gives back

A thick tube is pressurised past yield once, at the factory, so that releasing the pressure leaves its bore in compression and the working pressure must overcome that before it does any harm. The obvious rule is to overstrain as far as possible — right through the wall. For a tube whose outside is more than 2.22 times its bore that is wrong: the release itself reverses the bore past yield, and every newton of overstrain beyond twice the first-yield pressure is given back on the way down. The best overstrain stops part-way through the wall, and a steel that yields early in reverse stops it sooner.

Six millimetres of slip draw the Eurocode's line. The least degree of shear connection at which a 457 × 191 × 67 UB in S355 under a 130 mm slab of C30/37 2.5 m wide, with 19 mm studs of 80 kN can reach 95 per cent of its plastic moment without its end studs slipping more than 6 mm, against the span (solid), and EN 1994-1-1's minimum for ductile studs in a beam with equal steel flanges, 1 − (355/fy)(0.75 − 0.03L), not less than 0.4 (dashed). 6 m: 0.24 against 0.43; 8 m: 0.51 against 0.49; 10 m: 0.61 against 0.55; 12 m: 0.69 against 0.61; 14 m: 0.75 against 0.67; 16 m: 0.77 against 0.73; 18 m: 0.80 against 0.79; 20 m: 0.88 against 0.85. From 8 m up the two differ by at most 0.08: a stud model and a slip capacity reproduce the rule's slope as well as its level. At 6 m the slip alone would allow 0.24, and the rule asks for 0.43. Internal forces

The slip the plastic moment asks of the studs

A composite beam with half the studs that full interaction needs still has 85 per cent of the full plastic moment, because the slab's compression block simply gets thinner and the steel finds its own neutral axis. That is the stress-block answer, and it assumes every stud slips as far as the beam asks. Follow the slip along the beam and the end studs of a 12 m beam need 6.6 mm to reach nine tenths of that moment and 9 mm to reach 95 per cent — past the 6 mm a stud is trusted to give. Require 6 mm and the Eurocode's minimum degree of shear connection comes out of the arithmetic, slope and all.

Below its ceiling, a row of braces is only its total. The critical moment of a beam 24 m long whose unbraced critical moment in uniform bending is 837 kN·m, held by one, two, three or five torsional braces equally spaced along it, against the braces' total rotational stiffness. At 4,336 kN·m/rad in all, the rows of two, three and five give 3,815, 3,726, 3,578 kN·m: how the stiffness is divided hardly matters, while one has already stopped. Each row then stops at its own ceiling, where the braces are stiff enough to be nodes and the beam buckles between them in one more half-wave than it has braces: 2,637 kN·m for one, 5,585 kN·m for two, 9,704 kN·m for three, 21,466 kN·m for five. The dashed line is 5,627 kN·m, the moment the beam is asked to carry; one and two cannot reach it however stiff they are. Stability

The stiffness a row of braces shares out

One torsional brace at midspan has a ceiling, the moment at which the beam gives up twisting it and buckles in two half-waves instead. A row of braces raises the ceiling with every brace added, and the stiffness each must have to reach its ceiling rises with the count — seventy-four times as much for eight braces as for one. That is the right answer to the wrong question. Asked for the moment the beam has to carry rather than for its ceiling, a row of braces needs very nearly the same total stiffness however many it is divided between, so each brace gets softer as the count goes up. The count has one job, which is to put the ceiling above the moment; the stiffness has the other.

The tub girder's shear centre at three stages of its building. A steel trough 1,500 mm deep, 3,000 mm between its web tops and 2,000 mm across its 12 mm bottom flange, with 12 mm webs and a 400 × 20 mm flange on each web, drawn to scale. Open, as it is lifted, its shear centre lies 706 mm below the bottom flange, outside the steel entirely. Closed across the top by a bracing truss equivalent to a plate 0.50 mm thick, which carries shear and no bending stress, it is still 538 mm below. With a 250 mm concrete deck cast and hardened across the web tops it is 1,127 mm above the bottom flange, inside the box. The steel's centroid, 673 mm up, does not move until the deck is cast. Sections and stress

The box that is a trough until its deck is cast

A composite tub girder is a box only once its concrete deck has hardened. Before that it is an open steel trough — two leaning webs and a bottom flange — whose shear centre lies seven hundred millimetres below its bottom flange, in the air, and whose resistance to twisting is the thickness of its plates cubed. A light truss across the top is what holds it together while the deck is poured, and it is a plate for shear and nothing else: an angle of ordinary size is worth half a millimetre of steel. That half-millimetre multiplies the trough's torsion constant two thousandfold, and leaves its shear centre almost exactly where it was. The bracing closes the box for twisting; it does not close it for the shear centre.

A crack at the cope's corner, and the hole its tip needs. A 457 × 190 beam end coped 150 mm long and 80 mm deep, reacting 350 kN of which 70 per cent comes and goes with traffic, to scale. A fatigue crack has grown 30 mm down the web from the corner where the cope's two cuts meet, the most stressed point of the coped section. At that depth the live load's range of stress intensity at its tip is 15.6 MPa√m, and a hole drilled with the tip inside it stops the crack only if its radius is at least (ΔK/10.5√fy)², 6.2 mm: a 12 mm hole. The crack and the hole together leave 341 mm of the 377 mm coped section below them. Connections

The hole at the tip of the crack

The commonest reason to repair a coped beam end is a fatigue crack at the corner of the cope, and the commonest repair needs no plate at all: a hole drilled so that the crack's tip is inside it, turning a crack into a smooth notch that the traffic can no longer drive. The hole has to be big enough, and how big is set by the crack — its radius grows in step with the crack's length. A 30 mm crack at a stringer's cope needs a 12 mm hole, a 60 mm crack a 24 mm one. The repair stops working at about 100 mm, where the hole outgrows a site drill and the section left beside it runs out of capacity at nearly the same depth. Most of the crack's life is spent far shorter than that, which makes the repair a matter of how early the crack is found.

The arch turns aside before it reaches the top of its path. The load parameter p = 16qL⁴/π⁴EIr against the crown's deflection, in radii of gyration, for a shallow pinned arch whose rise is 6.0 times its radius of gyration. Kept symmetric (dashed) it would carry the load to a limit point at p = 374.7. It never gets there: at p = 310.7 a sideways path branches off (solid), along which the load falls as the arch sways — the failure is a bifurcation, 17 per cent below the limit point. With an antisymmetric imperfection of 0.10 radii of gyration (thin line) the arch follows neither path and peaks at p = 272.6, 12 per cent below the perfect arch. Stability

The arch that turns aside before it snaps

A shallow frame of pinned bars can only go one way when it is pressed: down, symmetrically, over a maximum. An arch that bends has a second way out — sideways, one half dropping while the other lifts — and above a rise of about four and a half radii of gyration it takes that way before it ever reaches the maximum. The switch decides more than the load. Below it an arch is almost indifferent to a sideways imperfection; above it the load an arch carries falls as the two-thirds power of how crooked it was built, and a tenth of a radius of gyration costs it an eighth of its strength.

The water pushes on the chord, and the abutments push back along the arch. One horizontal ring of an arch dam, one metre high, 50 m below the water, spanning a 100 m gap with a central angle of 133.6°, drawn in plan with the water on the convex side. The water presses 491 kPa normal to the face everywhere (arrows); by the projection rule its resultant is that pressure times the chord, 49,050 kN per metre of height, pointing straight downstream. Each abutment pushes back along the ring's tangent, at 66.8° to the chord, so the two thrusts are N = pw/2sin(θ/2) = 26,686 kN — the pressure times the ring's radius, 54.4 m, which is the hoop formula of a pipe, arrived at without a pipe. Equilibrium

The angle that saves the most concrete

Cut an arch dam into horizontal rings and each ring is a curved surface with water on one side. The projection rule gives the water's whole push on it without an integral — the pressure times the chord — and the two abutments, pushing back along the ring, turn that into a thrust equal to the pressure times the radius, the hoop formula of a pipe arrived at without a pipe. From there one line of calculus says that the ring using least concrete has a central angle of 133.6°, whatever the canyon, the depth or the concrete. That number explains why arch dams in narrowing canyons are drawn at a constant angle rather than a constant radius, and why the angle that suits the concrete is not the one that suits the rock.

Squeeze an I-section and it loses its corner. Moment against curvature for an I-section of 3,000 mm² and 200 mm depth in mild steel, the moment over its unloaded plastic moment and the curvature over its unloaded first-yield curvature, at axial compressions of 0, 30, 60 per cent of its squash load (dots: first yield). At 0 per cent it first yields at 0.92 and reaches 98 per cent of its plastic moment, 1.00, at 1.2 times the unloaded first-yield curvature; at 30 per cent it first yields at 0.64 and reaches 98 per cent of its plastic moment, 0.75, at 2.3 times the unloaded first-yield curvature; at 60 per cent it first yields at 0.37 and reaches 98 per cent of its plastic moment, 0.44, at 6.4 times the unloaded first-yield curvature. Unloaded, the I-section turns its corner almost at once; squeezed, its web is yielding in compression before any moment arrives and its flanges have to be strained far past yield to carry what is left. Materials

The hinge a squeezed section has to work for

Unloaded, a rectangle carries half again its first-yield moment once it is fully plastic and an I-section only a little more, and the I-section gets there almost at once while the rectangle has to bend four times further. Put a column's axial load on them and both rankings move. The rectangle's reserve grows as 1.5(1 + n), to nearly three times its first-yield moment under heavy compression; the I-section's barely moves. And the I-section loses the thing that made it the beam everyone uses: under three-fifths of its squash load it needs more than five times the curvature to develop its plastic moment that it needs as a beam, because the compression has yielded its web before any bending began.

The hole in the web pulls the axis down after it. The effective section of a 1,500 × 8 mm web between 400 mm flanges 15.0 mm thick at the top and 25.0 mm at the bottom, in S355, bending with its top in compression, and the elastic stress on it. The top flange's outstands are slender and keep 91% of their width. The web is compressed over 959 mm of its depth and keeps 44% of that, as two strips next to the flange and the neutral axis, leaving a hole of 538 mm. The neutral axis sits 566 mm above the bottom, against 665 mm for the gross section, and the section keeps 78% of its gross elastic modulus: 9.91 × 10⁶ mm³ against 12.76. Sections and stress

The flange a slender web wants heavier

A girder's gross section is strongest with its flange steel shared equally, top and bottom. Its effective section is not, because a slender web loses the middle of whatever part of it is compressed, and moving steel into the compression flange raises the neutral axis and shortens that part. Forty millimetres of flange on a 1,500 by 8 mm web is best split 22 on top and 18 below, and split the other way round — 15 on top and 25 below, the shape of a composite girder's steel before its slab hardens — it keeps 70% of what the best split carries.

In a V-shaped canyon the rings carry the water, and the top rings more than theirs. The water pressure down the crown of a dam 100 m high in a V-shaped canyon 200 m wide at the crest, 5 m thick at the crest and 25 m at the base, with its rings at 133.6° (dashed), divided between the horizontal ring at each depth (solid) and the vertical cantilever at the crown (thin) so that the two deflect alike. At 4 m below the crest the ring carries 195% of the water there — the cantilever, loaded from below and free at the top, leans on it; at 49 m the cantilever carries 11%; at 89 m, 6%. Over the whole reservoir the cantilever carries 10% of the water and the rings the rest. Equilibrium

The water the valley floor takes

An arch dam is not a stack of rings. At its crown it is also a vertical cantilever fixed into the valley floor, and the water at each depth is shared between the ring there and the cantilever in whatever proportion makes them bend alike. In a V-shaped canyon the short lower rings are stiff and carry nearly everything, and the top rings carry up to twice their own water because the cantilever leans on them. In a U-shaped canyon the cantilever takes half the reservoir and bends the heel into tension that the ring formula never sees.

The shadow an opening casts on every perimeter. One column of a 260 mm flat slab (d = 225 mm) carrying 12 kN/m² on 400 × 400 mm columns, the shear 300 mm off centre, on a 10.0 m bay, to scale, with a 300 × 300 mm opening 225 mm (1.0d) from the column. The two tangents from the column's centre to the opening's corners (dashed) enclose 38.9 degrees, and every perimeter loses the part between them: 458 mm of the control perimeter 2d out (solid), 1,093 mm of the outer perimeter (dashed), the lost parts drawn faint. With the opening the outer perimeter stands 6.13d from the face instead of 5.36d, and the studs need 7 perimeters instead of 6; one of the 12 rails runs into the hole. Internal forces

A hole takes a tenth of every perimeter

A 300 mm riser cut a slab's depth from a column throws a shadow from the column's centre, and EN 1992-1-1 deletes whatever part of a punching perimeter falls inside it. The outer perimeter, being longest, loses the most length — but it loses the same share as the control perimeter, a tenth of each, because the shadow is an angle. The cost arrives somewhere less obvious: a seventh ring of studs, 24 per cent more steel, and studs needed in a bay a third of a metre shorter than before.

The room left between two planes of braces. The surface of a 168.3 mm chord unrolled flat — along the chord across, round it up — with the footprints where 114.3 mm braces at 45 degrees are welded to it: two from a K joint in one plane (solid), two from a K joint in a plane 90 degrees round the chord (dashed), both nodes at the same section, each with a 12.6 mm gap between its own toes. The narrowest gap between a brace of one plane and a brace of the other is 6.5 mm, against the 12.6 mm two welds need: too little to weld. Each footprint spans 85.6 degrees of the chord's circumference. Connections

Two planes of braces and one circumference

A tower leg or a triangular girder's chord receives K joints from two planes at once, and each can be checked as a planar joint: its gap, its eccentricity, its band. What the planar checks cannot see is that the two planes' braces are welded to the same tube. A 114 mm brace takes up 86 degrees of a 168 mm chord's circumference whatever its gap, so a square tower's two planes leave 6.5 mm between them where the welds need 12.6, and a triangular girder's braces land on each other. And two eccentricities at the edge of their band give the chord √2 or √3 times the moment the band was written for.

The water splits the tower's resonance, and a baffle flattens it. For a 12 m tank 8 m deep on a tower of period 2.5 s with 2% damping, 150 t of container, full: the base shear per unit of harmonic ground acceleration against the shaking's angular frequency, as a share of the frozen-water tower's peak. Frozen to its container, the water makes one resonance; free, it is a second mass on a spring tuned 0.69 times the tower's frequency, against Den Hartog's optimum of 0.71, and it splits the resonance in two — with half a per cent of damping both peaks are higher than the frozen one, 1.83 times it. A baffle giving 10% brings the peak to 0.21; the best damping for the rms, 27%, to 0.11. Dynamics

The water tower that could damp itself

A full water tower's sloshing water is a second mass on a spring, hung from the container at very nearly the tuning a designed tuned-mass damper would be given, and it weighs two-fifths as much as what it hangs from. Plain water has half a per cent of damping, so it splits the tower's resonance into two sharp peaks and helps nothing. A screen across the tank that gives it a tenth makes the water a damper: the tower's rms base shear falls to four-tenths of what it would be with the water frozen, and the same screen keeps working as the town empties the tank.

Two ways to put a bore in compression. For a tube 2.5 times its bore in a 900 N/mm² steel: the stress difference σθ − σr through the wall, as a share of the yield strength, at rest (dashed) and at the working pressure (solid) — for the wall shrunk together from two layers so that every layer's bore yields together at work, and for the same wall autofrettaged to its best overstrain (thin lines). The layered wall carries 540 N/mm², 1.43 times the first-yield pressure, and at rest its bore sits at −0.43 of yield; the autofrettaged wall carries 756, 2.00 times, its bore at rest at −1.00. Materials

The ceiling the bore sets

A thick tube can be put into compression at its bore two ways: overstrain it past yield once and let it spring back, or build it from layers each shrunk on to the one inside. The second never yields the steel at all. Two layers carry 1.43 times a plain tube's pressure where an overstrain carries 2; four layers 1.75; and no number of layers, no overstrain and no combination of the two carries more than twice. The ceiling is not in either method. It is the range the bore's stress swings through, which belongs to the assembled wall, and the floor that range may reach, which belongs to the steel.

Three braces do more where the moment is. The 24 m plate girder, its minor-axis second moment 2.67 × 10⁸ mm⁴ and its warping constant 1.00 × 10¹⁴ mm⁶, under a uniform load, held by three torsional braces asked to bring its peak moment to 5,627 kN·m: above, the moment diagram; below it, the twist of the buckled girder with the braces equally spaced, 6.0 m apart, and clustered 4.0 m either side of midspan, each at the stiffness that just reaches the moment. Equally spaced the row needs 8,537 kN·m/rad in all; clustered, 6,325, 26 per cent less. The clustered braces sit where the girder twists most, and the bays they leave at the ends carry little moment. Stability

Three braces where the moment is

A row of torsional braces is spaced equally because that is how it is drawn, and under a uniform moment equal spacing is very nearly the best there is. Under a moment that peaks at midspan it is not. Moving the outer two of three braces toward the middle cuts the total stiffness a 24 m girder needs by a quarter under a uniform load and a third under a point load, and the bays it leaves at the ends cost nothing, because they carry so little of the moment.

The same studs moved toward the supports slip less. Half of a 12.0 m composite beam, a 457 × 191 × 67 UB in S355 under a 130 mm C30/37 slab, with 50 per cent shear connection, 19 studs from the support (left) to mid-span (right): spaced evenly, and graded so that they crowd toward the support. Below, the slip along the half-span with the mid-span moment at 95 per cent of the beam's plastic moment: evenly spaced, the end studs must slip 8.8 mm; graded, 4.4 mm. The dashed line is the 6 mm a ductile stud is trusted to give. The plastic moment is the same for both, because the studs are the same in number and each reaches its capacity. Internal forces

The same studs, moved to where the slip is

A composite beam with half the studs full interaction needs reaches 85 per cent of the full plastic moment, if its end studs can slip as far as the beam asks — nearly 9 mm on a 12 m span, past the 6 mm a stud is trusted to give. Keep the same nineteen studs and crowd them toward the supports, and the end studs need 4.4 mm. Nothing about the beam's strength changes; what changes is how soon the slab's force builds up, and the least connection the slip allows falls from 0.69 to 0.40.

Two islands in one film: level with each other, or not. Contours of Prandtl's stress function for a 50 mm shaft bored with two 8 mm holes, their edges 2.0 mm apart; the shear stress is the film's slope, and each hole is an island, shaded, floating where the film's pull round it balances the pressure on it. Left, the holes side by side at 12.0 mm from the axis: by symmetry both islands float at the same height, 219, the film between them stays nearly flat, and the steel there carries almost nothing. The shaft keeps 95 per cent of the solid shaft's stiffness, and its largest stress, at the dot, is 1.13 times the solid shaft's surface stress. Right, one hole inside the other on one radius: the inner island floats at 237 and the outer at 156, so the film between them is steep and the steel between the holes carries up to 1.96 times; the shaft's largest stress, 2.03 times, is at the outer hole's outer edge, with the steel between the holes close behind. Sections and stress

Two islands in one film

Bore a hole along a shaft and its torsion film acquires an island that floats at a height of its own. Bore two and there are two islands, and the steel between them is a strip of film stretched from one to the other. Side by side at one radius, the islands float level, the strip is flat, and two holes cost twice one hole's stiffness and none of its stress. One inside the other on a radius, the islands float at different heights, the strip is steep, and the steel between the holes becomes the shaft's weak point.

A load between the posts racks the panel it stands in. Elevation of a Vierendeel girder of six 2 m panels, 1.5 m deep, its deck chord as stiff as its other chord and its posts, the load standing in the middle of its second panel; the racked shape exaggerated, the unloaded girder faint. The panel the load stands in carries most of its shear, and the deck chord there bends both as a Vierendeel chord and as a beam between its posts: 38 kN·m against 27 with the load at mid-span. The posts either side carry 56 and 11 kN·m, and the heaviest post 56. Structural form

The load that visits every panel

A Vierendeel girder checked for a load at mid-span is checked for one position of a load that, on a bridge, stands everywhere in turn. Crossing it, a 100 kN load puts 1.7 times the mid-span check's moment into the end panels' chords, loads the middle post that a central load leaves idle, and makes the deck chord a beam between its posts in every panel where its share of the shear is small. Equal chords stay the stiffest arrangement; a vehicle whose axles span a panel cannot stand in the middle of one.

Braces that cannot move can still be made stiffer where the moment is. The 24 m plate girder, its minor-axis second moment 2.67 × 10⁸ mm⁴ and its warping constant 1.00 × 10¹⁴ mm⁶, under a uniform load, held by braces at midspan and 6.0 m either side and asked to bring its peak moment to 5,627 kN·m: above, the moment diagram; below it, the twist of the buckled girder with the three braces equally stiff and with the middle one given 61 per cent of the row's stiffness, each row at the total that just reaches the moment; the ticks are drawn thicker for a stiffer brace. Equal, the row needs 8,537 kN·m/rad, 2,846 in each brace; graded, 7,067, 4,280 at midspan and 1,394 at each side, 17 per cent less. Stability

The braces that stay where the framing puts them

Three cross-frames on a girder usually go where the floor beams or the bridge's bays put them, and cannot be moved toward the moment. They can still be made unequal. Giving the middle one three-fifths of the row's stiffness saves a sixth of the total under a uniform load and more than a quarter under a point load — most of what moving them would save. Moved and graded together, they save no more than moved alone, because both are ways of making every brace twist by the same amount.

A core drilled into a slab the studs were laid out for without it. One column of a 260 mm flat slab (d = 225 mm) carrying 12 kN/m² on 400 × 400 mm columns, the shear 300 mm off centre, on a 10.0 m bay, to scale, its studs laid out for the slab without a hole — six rings of 14 mm studs on twelve rails, the last ring 4.25d from the face — and a 150 mm core 225 mm (1.00d) from the face. Its shadow from the column's centre takes 20.3 degrees of every perimeter. The studs' outer perimeter stands where the last ring leaves it, 5.75d out (solid); with the core the slab needs it at 5.74d (dashed), so the outer check is at 1.00 of its capacity, and the control check's studs at 0.79. No rail runs into it. Internal forces

The core drilled after the slab was built

A building in use acquires new services, and a core drilled through a flat slab beside a column is a routine instruction. The studs round the column were laid out for a slab without the hole, and the drill finds whatever is there. Whether it cuts a stud matters less than it looks. What decides is the outer perimeter, which the hole pushes outward while the studs stay where they are, and whether the slab survives is set by a margin nobody chose: the room left when the studs were rounded up to a stock size and the rings to a whole number.