Geometry beats material — page 12
The strand in the sun beside the strand in the shade
Halfway through hanging a stressed ribbon, one span is a sagging cable full of segments and the next is bare tendon stretched nearly straight, and the pier between them carries the difference of their pulls. A warm day takes tension off both — and at the flat sag a ribbon is laid at, the hung span is so nearly all stretch that it loses three quarters of what the bare one does. What moves the pier is not the weather but the shade: strand in the sun beside strand under concrete, 35 kN on the pier for every degree between them. No sun slackens the bare tendon. The hour does change something else, which is the level the joints are cast at.
Twenty screws that peak together
A leaning screw reaches its peak at two millimetres of slip and then lets go, so a row of twenty along the grain looks like the long bolted joint again — the end screws past their peak and falling while the middle ones have barely started. Follow the row slip by slip and it is not: in a member of ordinary depth twenty leaning screws carry 98 per cent of twenty times one, against the 74 per cent the effective-number rule allows. What decides it is one ratio — the slip the timber's stretch spreads along the row against the width of a screw's peak — and the rule is right only for a brittle thread in a thin member.
Three kilopascals that halve a tube in bending
A long thin tube in bending flattens until its section can carry no more, at an oval of exactly two ninths of its radius. Put a pressure on it and nothing about that shape changes. What changes is how much bending it takes to get there — as the square root of one plus the pressure over the ring's own buckling pressure — and for a steel tube 1.2 m across with a 2.5 mm wall that unit is 4 kPa. Three kilopascals of suction halve its bending capacity; a fifth of an atmosphere inside doubles it and hands the tube to another failure entirely.
The heavy chord the posts will not let work
A Vierendeel girder carries its shear as bending in its two chords, and when one chord is four times as stiff as the other the obvious rule gives it four fifths of the shear. With posts as stiff as the light chord it takes 0.56. The heavy chord's end moments have to be carried round each joint by a post, the post bends, and the heavy chord turns with its joints instead of bending between them. No amount of extra steel in that chord takes its share past 0.55 in the middle of a long girder; only the posts can, and they have to be about 150 times as stiff as the light chord to make the rule come true.
The overstrain the release gives back
A thick tube is pressurised past yield once, at the factory, so that releasing the pressure leaves its bore in compression and the working pressure must overcome that before it does any harm. The obvious rule is to overstrain as far as possible — right through the wall. For a tube whose outside is more than 2.22 times its bore that is wrong: the release itself reverses the bore past yield, and every newton of overstrain beyond twice the first-yield pressure is given back on the way down. The best overstrain stops part-way through the wall, and a steel that yields early in reverse stops it sooner.
The slip the plastic moment asks of the studs
A composite beam with half the studs that full interaction needs still has 85 per cent of the full plastic moment, because the slab's compression block simply gets thinner and the steel finds its own neutral axis. That is the stress-block answer, and it assumes every stud slips as far as the beam asks. Follow the slip along the beam and the end studs of a 12 m beam need 6.6 mm to reach nine tenths of that moment and 9 mm to reach 95 per cent — past the 6 mm a stud is trusted to give. Require 6 mm and the Eurocode's minimum degree of shear connection comes out of the arithmetic, slope and all.
The stiffness a row of braces shares out
One torsional brace at midspan has a ceiling, the moment at which the beam gives up twisting it and buckles in two half-waves instead. A row of braces raises the ceiling with every brace added, and the stiffness each must have to reach its ceiling rises with the count — seventy-four times as much for eight braces as for one. That is the right answer to the wrong question. Asked for the moment the beam has to carry rather than for its ceiling, a row of braces needs very nearly the same total stiffness however many it is divided between, so each brace gets softer as the count goes up. The count has one job, which is to put the ceiling above the moment; the stiffness has the other.
The box that is a trough until its deck is cast
A composite tub girder is a box only once its concrete deck has hardened. Before that it is an open steel trough — two leaning webs and a bottom flange — whose shear centre lies seven hundred millimetres below its bottom flange, in the air, and whose resistance to twisting is the thickness of its plates cubed. A light truss across the top is what holds it together while the deck is poured, and it is a plate for shear and nothing else: an angle of ordinary size is worth half a millimetre of steel. That half-millimetre multiplies the trough's torsion constant two thousandfold, and leaves its shear centre almost exactly where it was. The bracing closes the box for twisting; it does not close it for the shear centre.
The hole at the tip of the crack
The commonest reason to repair a coped beam end is a fatigue crack at the corner of the cope, and the commonest repair needs no plate at all: a hole drilled so that the crack's tip is inside it, turning a crack into a smooth notch that the traffic can no longer drive. The hole has to be big enough, and how big is set by the crack — its radius grows in step with the crack's length. A 30 mm crack at a stringer's cope needs a 12 mm hole, a 60 mm crack a 24 mm one. The repair stops working at about 100 mm, where the hole outgrows a site drill and the section left beside it runs out of capacity at nearly the same depth. Most of the crack's life is spent far shorter than that, which makes the repair a matter of how early the crack is found.
The arch that turns aside before it snaps
A shallow frame of pinned bars can only go one way when it is pressed: down, symmetrically, over a maximum. An arch that bends has a second way out — sideways, one half dropping while the other lifts — and above a rise of about four and a half radii of gyration it takes that way before it ever reaches the maximum. The switch decides more than the load. Below it an arch is almost indifferent to a sideways imperfection; above it the load an arch carries falls as the two-thirds power of how crooked it was built, and a tenth of a radius of gyration costs it an eighth of its strength.
The angle that saves the most concrete
Cut an arch dam into horizontal rings and each ring is a curved surface with water on one side. The projection rule gives the water's whole push on it without an integral — the pressure times the chord — and the two abutments, pushing back along the ring, turn that into a thrust equal to the pressure times the radius, the hoop formula of a pipe arrived at without a pipe. From there one line of calculus says that the ring using least concrete has a central angle of 133.6°, whatever the canyon, the depth or the concrete. That number explains why arch dams in narrowing canyons are drawn at a constant angle rather than a constant radius, and why the angle that suits the concrete is not the one that suits the rock.
The hinge a squeezed section has to work for
Unloaded, a rectangle carries half again its first-yield moment once it is fully plastic and an I-section only a little more, and the I-section gets there almost at once while the rectangle has to bend four times further. Put a column's axial load on them and both rankings move. The rectangle's reserve grows as 1.5(1 + n), to nearly three times its first-yield moment under heavy compression; the I-section's barely moves. And the I-section loses the thing that made it the beam everyone uses: under three-fifths of its squash load it needs more than five times the curvature to develop its plastic moment that it needs as a beam, because the compression has yielded its web before any bending began.
The flange a slender web wants heavier
A girder's gross section is strongest with its flange steel shared equally, top and bottom. Its effective section is not, because a slender web loses the middle of whatever part of it is compressed, and moving steel into the compression flange raises the neutral axis and shortens that part. Forty millimetres of flange on a 1,500 by 8 mm web is best split 22 on top and 18 below, and split the other way round — 15 on top and 25 below, the shape of a composite girder's steel before its slab hardens — it keeps 70% of what the best split carries.
The water the valley floor takes
An arch dam is not a stack of rings. At its crown it is also a vertical cantilever fixed into the valley floor, and the water at each depth is shared between the ring there and the cantilever in whatever proportion makes them bend alike. In a V-shaped canyon the short lower rings are stiff and carry nearly everything, and the top rings carry up to twice their own water because the cantilever leans on them. In a U-shaped canyon the cantilever takes half the reservoir and bends the heel into tension that the ring formula never sees.
A hole takes a tenth of every perimeter
A 300 mm riser cut a slab's depth from a column throws a shadow from the column's centre, and EN 1992-1-1 deletes whatever part of a punching perimeter falls inside it. The outer perimeter, being longest, loses the most length — but it loses the same share as the control perimeter, a tenth of each, because the shadow is an angle. The cost arrives somewhere less obvious: a seventh ring of studs, 24 per cent more steel, and studs needed in a bay a third of a metre shorter than before.
Two planes of braces and one circumference
A tower leg or a triangular girder's chord receives K joints from two planes at once, and each can be checked as a planar joint: its gap, its eccentricity, its band. What the planar checks cannot see is that the two planes' braces are welded to the same tube. A 114 mm brace takes up 86 degrees of a 168 mm chord's circumference whatever its gap, so a square tower's two planes leave 6.5 mm between them where the welds need 12.6, and a triangular girder's braces land on each other. And two eccentricities at the edge of their band give the chord √2 or √3 times the moment the band was written for.
The water tower that could damp itself
A full water tower's sloshing water is a second mass on a spring, hung from the container at very nearly the tuning a designed tuned-mass damper would be given, and it weighs two-fifths as much as what it hangs from. Plain water has half a per cent of damping, so it splits the tower's resonance into two sharp peaks and helps nothing. A screen across the tank that gives it a tenth makes the water a damper: the tower's rms base shear falls to four-tenths of what it would be with the water frozen, and the same screen keeps working as the town empties the tank.
The ceiling the bore sets
A thick tube can be put into compression at its bore two ways: overstrain it past yield once and let it spring back, or build it from layers each shrunk on to the one inside. The second never yields the steel at all. Two layers carry 1.43 times a plain tube's pressure where an overstrain carries 2; four layers 1.75; and no number of layers, no overstrain and no combination of the two carries more than twice. The ceiling is not in either method. It is the range the bore's stress swings through, which belongs to the assembled wall, and the floor that range may reach, which belongs to the steel.
Three braces where the moment is
A row of torsional braces is spaced equally because that is how it is drawn, and under a uniform moment equal spacing is very nearly the best there is. Under a moment that peaks at midspan it is not. Moving the outer two of three braces toward the middle cuts the total stiffness a 24 m girder needs by a quarter under a uniform load and a third under a point load, and the bays it leaves at the ends cost nothing, because they carry so little of the moment.
The same studs, moved to where the slip is
A composite beam with half the studs full interaction needs reaches 85 per cent of the full plastic moment, if its end studs can slip as far as the beam asks — nearly 9 mm on a 12 m span, past the 6 mm a stud is trusted to give. Keep the same nineteen studs and crowd them toward the supports, and the end studs need 4.4 mm. Nothing about the beam's strength changes; what changes is how soon the slab's force builds up, and the least connection the slip allows falls from 0.69 to 0.40.
Two islands in one film
Bore a hole along a shaft and its torsion film acquires an island that floats at a height of its own. Bore two and there are two islands, and the steel between them is a strip of film stretched from one to the other. Side by side at one radius, the islands float level, the strip is flat, and two holes cost twice one hole's stiffness and none of its stress. One inside the other on a radius, the islands float at different heights, the strip is steep, and the steel between the holes becomes the shaft's weak point.
The load that visits every panel
A Vierendeel girder checked for a load at mid-span is checked for one position of a load that, on a bridge, stands everywhere in turn. Crossing it, a 100 kN load puts 1.7 times the mid-span check's moment into the end panels' chords, loads the middle post that a central load leaves idle, and makes the deck chord a beam between its posts in every panel where its share of the shear is small. Equal chords stay the stiffest arrangement; a vehicle whose axles span a panel cannot stand in the middle of one.
The braces that stay where the framing puts them
Three cross-frames on a girder usually go where the floor beams or the bridge's bays put them, and cannot be moved toward the moment. They can still be made unequal. Giving the middle one three-fifths of the row's stiffness saves a sixth of the total under a uniform load and more than a quarter under a point load — most of what moving them would save. Moved and graded together, they save no more than moved alone, because both are ways of making every brace twist by the same amount.
The core drilled after the slab was built
A building in use acquires new services, and a core drilled through a flat slab beside a column is a routine instruction. The studs round the column were laid out for a slab without the hole, and the drill finds whatever is there. Whether it cuts a stud matters less than it looks. What decides is the outer perimeter, which the hole pushes outward while the studs stay where they are, and whether the slab survives is set by a margin nobody chose: the room left when the studs were rounded up to a stock size and the rings to a whole number.