Ladder

Soil arching — the ladder

One essay so far against this idea. A ladder is the distinct arguments that stand against one idea, and this one has room to grow.
  1. Two identical pipes, and one carries three times the other. Load per metre on a buried conduit against the depth of cover, in trench widths, with the weight of the prism of soil directly above it drawn between them. A conduit laid in a narrow trench is stiffer than nothing and softer than the sides: the backfill settles relative to the undisturbed ground, the friction on the trench walls acts upward, and the conduit gets 64% of the prism. Lay the same conduit on the ground and build an embankment over it and it is now stiffer than the fill beside it, the interior prism settles less, the friction acts downward, and it gets 172% — a factor of 2.71 between two pipes with nothing different but which way the ground moved. The equation is Janssen's, the same one a silo wall obeys, with a trench for a silo; both curves start on the prism line, because with no depth there is no shear to redistribute anything. This is why a flexible pipe is buried rather than a rigid one: making the conduit weaker moves it down the page.

    The pipe decides what the soil weighs

    A buried conduit is not loaded by the soil above it. It is loaded by whatever share of that soil the relative movement leaves it — and which way the shear on the sides of the prism acts depends on whether the conduit settles more or less than the ground beside it. Two identical pipes under identical fill, one carrying two thirds of the prism and one carrying nearly twice it.

    rung 1 · equilibrium

All ladders