Lateral pile — the series
-
A pile has no length until the ground gives it one
Almost every other structural member is handed a length by the drawing. A pile goes into the ground until it stops, and what decides how much of it is working is a fifth root of the ratio between its own stiffness and the soil's.
-
The pile that is too short to bend
A laterally loaded pile is long or short in its own characteristic length, and the two are different structures. The slender pile bends and the ground below four characteristic lengths never hears about it; the monopile is two lengths deep, rotates about a point, and every tabulated coefficient written for the first case is wrong for the second.
-
The layer a pile feels
A pile pushed sideways in uniform ground has one characteristic length, the fifth root of its stiffness over the ground's, and every answer is a multiple of it. Put a soft layer over stiff ground and that length stops existing. The head feels the top of the ground in proportion to the square of its own deflection, so an average weighted that way gets the head deflection within eight per cent. It gets the moment a quarter too low: with soft ground two characteristic lengths thick over stiff, the pile bends harder than it would in either ground alone, and the peak sits where the stiff ground takes hold.
-
The shelter that stops at the interface
Piles in a group shelter one another, and practice counts the shelter as a factor on each row's soil, calibrated on groups in uniform ground. Put the same group in soft ground over stiff and the calibration has to be read one of two ways — the shelter at every depth, or only where the ground is soft — and the two readings disagree about which row works hardest. The first gives the leading pile 17 per cent more moment at the cap; the second gives the last pile 24 per cent more in the ground.