The most dangerous day is before it is finished
A structure is analysed once, complete, with every restraint present. It spends weeks in states nobody drew — a beam landed with no deck on it holds 17% of the moment its section is worth, a frame not yet braced buckles at a third of the load it will, and a bolt not yet tightened is a pin where the analysis assumed a fixity.
rung 1 · stability