Series

Effective length — the series

4 essays on one idea, from the one that introduces it to the one that assumes the rest.
  1. The ends decide the length that matters. Four columns of identical height and section, buckling under four sets of end conditions. The effective length factor is the fraction of the column that behaves like a pin-ended one, and the buckling load goes as its inverse square.

    The ends decide the length that matters

    Four columns of identical height and section, buckling at loads sixteen times apart. Nothing differs but what is holding the two ends.

    part 1 · stability
  2. A brace is a stiffness requirement, not a strength one. Critical load against brace stiffness for a pinned column braced at mid-height. The curve climbs from the unbraced Euler load of 9.87EI/L² and flattens at 39.48EI/L², which is the Euler load of the braced segment — past that the column buckles in a shape the brace does not obstruct, and further stiffness buys nothing. The knee is at about 159EI/L³. A stiffness of 60EI/L³ is marked, reaching 21.75EI/L².

    The brace that need not be strong

    A brace holding a column at mid-height carries almost no force. What it has to be is stiff — and the stiffness required is exact, large, and reached at a knee past which more buys nothing at all.

    part 2 · stability
  3. The knee moves out as the braces multiply. The critical load of a pin-ended column, over the Euler load of the segments between its braces, against the braces' stiffness in units of that load over the segment's length, for one, two and four braces. Each curve rises to the segment's Euler load and stays there; the knee where it arrives is at 2.00, 3.00, 3.62. With no braces at all the column buckles at 1/(n + 1)² of the segment's load: 0.25, 0.11, 0.04.

    The braces that have to hold each other

    One brace at mid-height must have a stiffness of twice the column's load over the length it halves. Spread the same column over four braces and each one must be stiffer, not softer: 3.62 times the load over its segment, rising towards four with every brace added, because the shape the braces have to stop is a zigzag in which every brace point is pushed by both its neighbours. Braces that tie the column to itself instead of to the ground need one, however many there are. A row with surplus stiffness can carry one brace at two thirds of the ideal, but not one that is missing, and the force each brace has to resist grows with the count.

    part 3 · stability
  4. A floor that shears lowers the storey's buckling load before the core does. The buckling factor of a storey of eleven lines of leaning columns, ten bays, each column carrying 3,000 kN over 3.6 m and built a three-hundredth out of plumb, held by a floor to a core sized for a buckling factor of 4.0 were the floor rigid, against the floor's shear stiffness per bay as a multiple of a column's sway softening P/h, logarithmic, with the core at one end, in the middle, or split between both ends; dotted, the rigid floor's 4.0. At 100 times the factor is 1.52, 2.80 and 3.02; at 1,000 times, 3.49, 3.84 and 3.88; a concrete slab is several thousand times.

    The floor the columns lean on

    A storey of pin-ended columns, every one a little out of plumb, leans on its floor, and the floor leans on a core. Count the floor as rigid and the core needs the sum of the columns' demands. A floor that shears in its own plane is a brace in series with the core, and the far columns lean on it before their push arrives. With a floor a hundred times stiffer per bay than a column's own sway softening, the storey's buckling factor falls from 4.0 to 1.5 and the core is asked for twice as much.

    part 4 · stability

All series