Creep — the series
-
The deflection that arrives three years late
A concrete beam that passes every check on the day it is built goes on deflecting for a decade, and ends up three times where it started. Nothing about the load changed, and nothing about the strength was ever in question.
-
The stress that leaks away
Creep makes a load's deflection grow and an imposed strain's stress shrink, and the second is why restrained concrete does not crack as often as an elastic calculation says. The same material property runs both ways, and which way it runs depends on whether the structure was given a force or a movement.
-
The creep that belongs to the member
A creep coefficient is quoted for a concrete, and half of it is not a property of the concrete. It is the member drying out, and drying goes through the surface — so one mix creeps a quarter more in a thin slab than in a deep beam, gets there years sooner, and in saturated air forgets its size altogether.
-
The slab that dries from one face
A creep coefficient is one number for a member, and a member drying through one face does not have one. Give every depth its own humidity and the section a strain profile it cannot deliver, and two things follow that no single coefficient contains — a six-metre slab lifts eleven millimetres at its edges with nothing on it, and its top surface is past cracking before it has been loaded.
-
The support that had no moment when it was cast
Two beams are set on their bearings, carry their own weight for a month, and are then stitched together over the middle support. Nothing about the loading changes afterwards. Twenty years later the stitch is carrying 155 kilonewton-metres, because the concrete went on creeping and the joint would not let it — and how much arrives is decided by a crane schedule.
-
The prestress the member takes back
A tendon is stretched, locked off against the concrete, and then has to hold that extension while the concrete underneath it shortens by itself. Fifteen per cent of the force goes, most of it to creep, and how much goes is decided by the shape of the member and the air it stands in rather than by anything about the steel.
-
The slab that shrinks onto a finished beam
A precast beam with an in-situ slab cast on it is one member made of two concretes, and they do not age together. The slab's shrinkage is nearly the same whenever it is poured; what changes is how much shrinking the beam has left to share it with. Cast the slab at six weeks and it takes a ninth of the soffit's precompression away over thirty years. Cast it at a year and it takes a quarter, and goes into tension itself.
-
The pier that bends the wrong way
Two precast beams are made continuous over a pier by a joint cast with the deck, and the joint is designed for the hogging moment a continuous beam has there. Thirty years later it is sagging, by more than the moment that cracks its underside, because the beams were still cambering upward when they were joined. Whether that happens is decided by two dates — when the beams were cast and when the joint was — and the deck's shrinkage, which pulls the other way, is not enough to stop it.