The characteristic strength, which nothing was measured at
The characteristic strength, which nothing was measured at. A lognormal population of strengths with a mean of 30 N/mm² and a coefficient of variation of 0.15. The characteristic value is the 5% fractile — 23.2 N/mm², which is 77% of the mean, and which need not be the strength of any specimen that was tested. Dividing it by 1.50 gives 15.5, and the shaded sliver below that is the fraction of the population that would fail to reach it: 6.4e-6, or one in 155,818. A factor applied to a fractile is not covering the scatter, because the scatter has already been spent getting to the fractile.
9 essays call
strength-scatter. The drawing above is what it returns with no arguments at all; every
call below passes it something, because a placement that passes nothing draws whichever
member of the family the generator happens to default to rather than the one its essay
argues about.
Where it is called
Changing this generator changes every one of these figures.
The strength no specimen had
A material property is written into a calculation as a number, and a material does not have one. It has a population of strengths with a mean and a spread, and the number used is a low fractile of that population — a value that need not have been measured, that most of the material exceeds, and whose distance below the mean is decided entirely by the scatter.
The dimension nobody can measure
Every flexural capacity in reinforced concrete is proportional to the effective depth, and the effective depth is not on the drawing. It is what is left of the thickness after a cover, a link and half a bar diameter have been taken off it — and each of those is a site tolerance. In a slab, ten millimetres of workmanship is six per cent of the strength.
The same steel, and a wider crack
A crack's width is the distance between cracks times the strain the steel carries over that distance. Neither of those is decided by how much reinforcement there is. The spacing is a bond length, so it goes as the bar diameter; the strain is set by the stress in the steel. Two arrangements of identical steel can differ by a factor of two in crack width, and the one that wins is the one with more, smaller bars.
The ductility that depends on the ruler
Percentage elongation after fracture is the most quoted ductility measure in the subject and one of the least well defined. A specimen stretches uniformly until the ultimate load and then localises, so the number is a strain plus a length — and dividing a length by the gauge length makes the answer a property of the specimen.
The load that is never all there at once
A column at the bottom of twenty storeys is designed for the imposed load of twenty floors added up, and twenty floors do not reach their own worst day together. The reduction that follows is not a discount on the safety margin. It is the central limit theorem, and it has a floor it never goes below.
The strength it had on the day
Every concrete strength a design quotes is a twenty-eight-day cylinder value, and a structure is loaded long before that — formwork struck at three days, the next storey cast at seven, a prestressing force transferred at two. The number that existed at the moment the load arrived is a different one.
The strength that belongs to the test programme
A characteristic strength is a fractile of a distribution, and a distribution estimated from four specimens is not the same object as one known exactly. The same material tested four times reports a strength 15 per cent below what it reports when its scatter is known — and nothing about the material differs.
The strength three cores revise
A characteristic strength estimated from three specimens and nothing else is heavily penalised, because three results cannot say how scattered a material is. An existing structure is never nothing else. It was built to a specified grade, from a population of concretes whose scatter is known in general, and three cores drilled from it revise that knowledge rather than replace it. Together they give a characteristic strength that three cores alone would need twenty to match. The same arithmetic catches a concrete much weaker than its specification, because cores that disagree with the prior widen it — unless the prior is given so much weight that it no longer listens.
The cores that agree for the wrong reason
Three cores drilled a metre apart in one slab share a pour, a curing and a morning's water, so they agree with each other more closely than they agree with the rest of the building. Counted as three independent specimens, they overstate what is known — and with nothing else to go on, the estimate built on them leaves a quarter of the building's concrete below a value meant to leave a twentieth. Counting them by their correlation repairs that. But once the specification is in the update, the honest count hands the estimate back to the specification, and a concrete weaker than it was meant to be hides behind it. The repair is not in the arithmetic. It is in where the cores are drilled.