The guyed-mast generator
The windward guy tightens, the leeward one gives way. A 120 m mast on three guy levels, at a wind of 3 N/mm, with the deflection drawn 0.5 times its true size. The guys start at 160 kN each and end at 259 against 95, 299 against 83, 221 against 112 kN. The leeward guys still carry a real force — the lowest keeps 28 per cent of its partner's tension — and supply almost none of the restraint, because their tangent modulus has fallen to 54 per cent of the steel's. The mast top moves 100 mm, its worst bending moment is 554 kNm at 40 m, and it is carrying 801 kN of axial load that nothing but the guys put there.
1 essay calls
guyed-mast. The drawing above is what it returns with no arguments at all; every
call below passes it something, because a placement that passes nothing draws whichever
member of the family the generator happens to default to rather than the one its essay
argues about.
Where it is called
Changing this generator changes every one of these figures.